Continued Monitoring of Instrumented Pavement in Ohio [Final Report]
Advanced Search
Select up to three search categories and corresponding keywords using the fields to the right. Refer to the Help section for more detailed instructions.

Search our Collections & Repository

All these words:

For very narrow results

This exact word or phrase:

When looking for a specific result

Any of these words:

Best used for discovery & interchangable words

None of these words:

Recommended to be used in conjunction with other fields

Language:

Dates

Publication Date Range:

to

Document Data

Title:

Document Type:

Library

Collection:

Series:

People

Author:

Help
Clear All

Query Builder

Query box

Help
Clear All

For additional assistance using the Custom Query please check out our Help Page

i

Continued Monitoring of Instrumented Pavement in Ohio [Final Report]

Filetype[PDF-4.46 MB]


  • English

  • Details:

    • Publication/ Report Number:
    • Resource Type:
    • Geographical Coverage:
    • Edition:
      Final report
    • NTL Classification:
      NTL-HIGHWAY/ROAD TRANSPORTATION-Pavement Management and Performance;NTL-HIGHWAY/ROAD TRANSPORTATION-Construction and Maintenance;
    • Abstract:
      Performance and environmental data continued to be monitored throughout this study on the Ohio SHRP Test Road. Response testing included three new series of controlled vehicle tests and two sets of nondestructive tests. Cracking in two SPS-2 sections with lean concrete base confirmed observations elsewhere that PCC pavement may not perform well when placed on rigid base. Of the five types of base material used on LOG 33 and evaluated for their effect on AC pavement performance, deflection measurements on the asphalt treated base fluctuated most with changes in temperature. None of the other bases were sensitive to temperature. Cement treated base had the lowest deflection. On unbound material, bases containing large size stone gave the lowest deflection. The preponderance of data collected in the laboratory and at the ERI/LOR 2 site suggests that PCC pavement performs poorly on 307 NJ and CTFD bases. All sections with 25-foot slabs, except those with ATFD base, and the section with 13-foot slabs on 307 NJ base had significant transverse cracking. The 13-foot long slabs with 307 NJ base also had some longitudinal cracking. Considering the relatively short time these pavement sections had been in service, this level of performance was considered unacceptable. The ATFD base appeared to be performing best. On JAC/GAL 35, subgrade stiffness had a significant effect on dowel bar response. Looseness around dowel bars affected their ability to transfer load. Larger diameter and stiffer dowel bars provided better load transfer across PCC joints. The most effective dowel bar in these tests was the 1.5" diameter steel bar. The performance of 1" steel dowel bars were similar to 1.5" fiberglass bars. One-inch diameter fiberglass dowel bars were not recommended for PCC pavement. While undercutting PCC joint repairs initially reduced the forces in dowel bars, the effectiveness of the undercut diminished over time. Dowel bar forces were about the same in the Y and YU types of joint repairs after some time.
    • Format:
    • Main Document Checksum:
    • File Type:

    Supporting Files

    • No Additional Files

    More +

    Related Documents

    You May Also Like

    Checkout today's featured content at rosap.ntl.bts.gov

    Version 3.26