Effectiveness of Base Type on the Performance of PCC Pavement on ERI/LOR2: Interim Report for Project Entitled Continued Monitoring of Instrumented Pavement in Ohio, State Job No. 14652(0)
-
2000-04-01
Details:
-
Alternative Title:Continued monitoring of instrumented pavement in Ohio
-
Creators:
-
Corporate Creators:
-
Corporate Contributors:
-
Subject/TRT Terms:
-
Publication/ Report Number:
-
Resource Type:
-
Geographical Coverage:
-
OCLC Number:631862473
-
Corporate Publisher:
-
NTL Classification:NTL-HIGHWAY/ROAD TRANSPORTATION-Pavement Management and Performance;NTL-HIGHWAY/ROAD TRANSPORTATION-Materials;NTL-HIGHWAY/ROAD TRANSPORTATION-Soils and Geology;
-
Abstract:This interim report discusses the current status of the ERl / LOR 2 research project that is investigating the effects of various base materials and design features on the performance of Portland concrete cement pavement. In 1990, rehabilitation of the initial project begun in 1974 was undertaken through the construction of additional test pavements in the westbound lanes of SR 2 between Station 1835+10 in Erie County and Station 90 +23 in Lorain County.
-
Format:
-
Funding:
-
Collection(s):
-
Main Document Checksum:
-
Download URL:
-
File Type: