Goslin, K., Pomeroy, B., Dagher, H., Berube, K., & Davids, W. (2014). Bridge-in-a-Backpack(TM). Task 8 : investigation of bridge performance under extreme temperatures (Report No. ME 15-04). Maine. Dept. of Transportation. https://rosap.ntl.bts.gov/view/dot/29094
Goslin, Keenan, Ben Pomeroy, Habib Dagher, Keith Berube, and William Davids. Bridge-in-a-Backpack(TM). Task 8 : investigation of bridge performance under extreme temperatures. Report no. ME 15-04. Maine. Dept. of Transportation, 2014. https://rosap.ntl.bts.gov/view/dot/29094.
Goslin, Keenan, et al. Bridge-in-a-Backpack(TM). Task 8 : investigation of bridge performance under extreme temperatures. Maine. Dept. of Transportation, 2014, Report no. ME 15-04, ROSA P. https://rosap.ntl.bts.gov/view/dot/29094.
This report includes fulfillment of Task 8 of a multi-task contract to further enhance concrete filled FRP tubes, or
;
the Bridge in a Backpack.
;
One recurring question has been its performance in fire conditions, mainly small campfires and handheld torches.
;
Previous testing for this technology at the Composites Center has looked at its ignitability using small coupons or
;
sections of the concrete filled arch. This task provides a more extensive look at the performance of this particular
;
composite system. This project consisted of three phases including: laboratory coupon tests; large scale field fire
;
tests of a traditional steel girder and concrete deck specimen and a hybrid composite arch test specimen; and a
;
laboratory structural test to evaluate residual capacity of the composite arches after the field fire test. The principal
;
objective of this project was to compare the performance of the two full scale test specimens when exposed to the
;
same fire environment.
This report includes fulfillment of Task 4 of a multi-task contract to further enhance concrete filled FRP tubes, or the Bridge in a Backpack. Task 4
...
The Bridge-in-a-Backpack™ has previously been demonstrated with short spans. The firstconstructed one, Neal Bridge in Pittsfield, Maine had a span of
...
The cost effective use of FRP composites in infrastructure requires the efficient use of thecomposite materials in the design. Previous work during th
...
This report includes fulfillment of Tasks 2.1 and 2.2 of a multi-task contract to further enhance concrete filled FRPtubes, or the Bridge in a Backpac
...
This report includes fulfillment of Task 2.3 of a multi-task contract to further enhance concrete filled FRP tubes, orthe Bridge in a Backpack. Task 2
...
The arch-shaped concrete filled fiber reinforced polymer tube bridges are being constructed throughout NewEngland and elsewhere. The composite system
...
Five bridges were constructed utilizing UMaine’s hybrid composite arch technology as part of the MaineDepartment of Transportation’s Composites Initia
...
This report includes fulfillment of Task 7 of a multi-task contract to further enhance concrete filled FRP tubes, orthe Bridge in a Backpack.Damage du
...
This report includes fulfillment of Task 3.1 of a multi-task contract to further enhance concrete filled FRP tubes, or the Bridge in a Backpack. Task
...
This report includes fulfillment of Task 3.3 of a multi-task contract to further enhance concrete filled FRP tubes, or the Bridge in a Backpack. Task
...
This report includes fulfillment of Task 5 of a multi-task contract to further enhance concrete filled FRP tubes, orthe Bridge in a Backpack. Task 6 p
...
This report includes fulfillment of Task 6 of a multi-task contract to further enhance concrete filled FRP tubes, orthe Bridge in a Backpack. Task 6 p
...
This report includes fulfillment of Task 3.2 of a multi-task contract to further enhance concrete filled FRP tubes, or the Bridge in a Backpack. Task
...
Goslin, K., Pomeroy, B., Dagher, H., Berube, K., & Davids, W. (2014). Bridge-in-a-Backpack(TM). Task 8 : investigation of bridge performance under extreme temperatures (Report No. ME 15-04). Maine. Dept. of Transportation. https://rosap.ntl.bts.gov/view/dot/29094
Goslin, Keenan, Ben Pomeroy, Habib Dagher, Keith Berube, and William Davids. Bridge-in-a-Backpack(TM). Task 8 : investigation of bridge performance under extreme temperatures. Report no. ME 15-04. Maine. Dept. of Transportation, 2014. https://rosap.ntl.bts.gov/view/dot/29094.
Goslin, Keenan, et al. Bridge-in-a-Backpack(TM). Task 8 : investigation of bridge performance under extreme temperatures. Maine. Dept. of Transportation, 2014, Report no. ME 15-04, ROSA P. https://rosap.ntl.bts.gov/view/dot/29094.
ROSA P serves as an archival repository of USDOT-published products including scientific
findings, journal articles, guidelines, recommendations, or other information authored or co-authored by
USDOT or funded partners. As a repository, ROSA P retains documents in their original published format to
ensure public access to scientific information.
Links with this icon indicate that you are leaving a Bureau of Transportation
Statistics (BTS)/National Transportation Library (NTL)
Web-based service.
Thank you for visiting.
You are about to access a non-government link outside of
the U.S. Department of Transportation's National
Transportation Library.
Please note: While links to Web sites outside of DOT are
offered for your convenience, when you exit DOT Web sites,
Federal privacy policy and Section 508 of the Rehabilitation
Act (accessibility requirements) no longer apply. In
addition, DOT does not attest to the accuracy, relevance,
timeliness or completeness of information provided by linked
sites. Linking to a Web site does not constitute an
endorsement by DOT of the sponsors of the site or the
products presented on the site. For more information, please
view DOT's Web site linking policy.
To get back to the page you were previously viewing, click
your Cancel button.