Search Results

Advanced Search
Select up to three search categories and corresponding keywords using the fields to the right. Refer to the Help section for more detailed instructions.

Search our Collections & Repository

For very narrow results

When looking for a specific result

Best used for discovery & interchangable words

Recommended to be used in conjunction with other fields

Dates

to

Document Data
Library
People
Clear All
Clear All

For additional assistance using the Custom Query please check out our Help Page

Federal Highway Administration Federal Highway Administration

Federal Highway Administration

This collection contains reports and resources from the Federal Highway Administration (FHWA). Bookmark this collection: https://rosap.ntl.bts.gov/collection_fhwa or https://doi.org/10.21949/1530833.

Narrow Results:
Publication Year
Resource Type
People
Organizations
Publisher
Series
Keywords
  • x
    Connected vehicles (243)
Report Number
Funding Number
x Connected Vehicles
  • Vehicle to Infrastructure V2I BenefitCost Analysis BCA Tool Prototype supporting software
    Vehicle to Infrastructure (V2I) Benefit-Cost Analysis (BCA) Tool Prototype [supporting software]
    :
    :
  • VehicletoInfrastructure V2I BenefitCost Analysis BCA Tool Prototype Development and Future Opportunities Phase 3 Project October 2020  July 2025
    Vehicle-to-Infrastructure (V2I) Benefit-Cost Analysis (BCA) Tool Prototype: Development and Future Opportunities: Phase 3 Project: October 2020 - July 2025
    :
    :
  • Vehicle to Infrastructure V2I BenefitCost Analysis BCA Tool Prototype User Guide Version 20251
    Vehicle to Infrastructure (V2I) Benefit-Cost Analysis (BCA) Tool Prototype: User Guide Version 2025.1
    :
    :
  • LaneChange Response to Infrastructure Warning About Lane Closure in a Mixed Vehicle Fleet
    Lane-Change Response to Infrastructure Warning About Lane Closure in a Mixed Vehicle Fleet
    :
    :
  • Truck Platooning Impacts on Bridges Phase II  Structural Serviceability
    Truck Platooning Impacts on Bridges: Phase II – Structural Serviceability
    :
    :
  • VehicletoEverything V2X Deployer Resource
    Vehicle-to-Everything (V2X) Deployer Resource
    :
    :
  • Federal Highway Administration FHWA Connected and Automated Vehicles CAV Analysis Modeling and Simulation AMS Program Future Effective Capacity Assessing Traffic Flow Impacts for Variable Levels of Automation and Market Acceptance
    Federal Highway Administration (FHWA) Connected and Automated Vehicles (CAV) Analysis, Modeling, and Simulation (AMS) Program: Future Effective Capacity: Assessing Traffic Flow Impacts for Variable Levels of Automation and Market Acceptance
    :
    :
  • Federal Highway Administration FHWA Connected and Automated Vehicles CAV Analysis Modeling and Simulation AMS Program Connected Automated and Electric Modeling Traffic and Traveler Choice Considering the Three MegaTrends
    Federal Highway Administration (FHWA) Connected and Automated Vehicles (CAV) Analysis, Modeling, and Simulation (AMS) Program: Connected, Automated, and Electric: Modeling Traffic and Traveler Choice Considering the Three Mega-Trends
    :
    :
  • Synthesis Report  Bilateral Exchanges between the Federal Highway Administration and the Netherlands Rijkswaterstaat
    Synthesis Report: Bilateral Exchanges between the Federal Highway Administration and the Netherlands' Rijkswaterstaat
    :
    :
  • Advanced Traffic Signal Control Optimization in a Cooperative Driving Automation Environment
    Advanced Traffic Signal Control Optimization in a Cooperative Driving Automation Environment
    :
    :
  • Intelligent Transportation Systems Deployment Tracking Survey 2023 Arterial Management Survey Findings
    Intelligent Transportation Systems Deployment Tracking Survey: 2023 Arterial Management Survey Findings
    :
    :
  • Intelligent Transportation Systems Deployment Tracking Survey 2023 Transit Management Survey Findings
    Intelligent Transportation Systems Deployment Tracking Survey: 2023 Transit Management Survey Findings
    :
    :
  • Intelligent Transportation Systems Deployment Tracking Survey 2023 Freeway Management Survey Findings
    Intelligent Transportation Systems Deployment Tracking Survey: 2023 Freeway Management Survey Findings
    :
    :
  • Synthesis of Alternative Intersection Forms
    Synthesis of Alternative Intersection Forms
    :
    :
  • An OpenSource Tool to Enable Interoperable Connectivity
    An Open-Source Tool to Enable Interoperable Connectivity
    :
    :
  • Postevent Connected Vehicle Data Exploration  Lessons Learned
    Post-event Connected Vehicle Data Exploration - Lessons Learned
    :
    :
  • Digital TwinEnabled Extended Active Safety Analysis for Mixed Traffic
    Digital Twin-Enabled Extended Active Safety Analysis for Mixed Traffic
    :
    :
  • Connected Vehicle Pilot Deployment Program Phase 4 Interface Control Document ICD WYDOT CV Pilot
    Connected Vehicle Pilot Deployment Program Phase 4, Interface Control Document (ICD)– WYDOT CV Pilot
    :
    :
  • Advanced Driver Assistance SystemEquipped Vehicle Datasets Collected in Central Ohio Final Report
    Advanced Driver Assistance System-Equipped Vehicle Datasets Collected in Central Ohio: Final Report
    :
    :
  • WeatherResponsive Management Strategies WRMS Fact Sheet  Pathfinder Arizonas Coordinated Messaging on Snowstorm Impacts
    Weather-Responsive Management Strategies (WRMS) Fact Sheet - Pathfinder: Arizona’s Coordinated Messaging on Snowstorm Impacts
    :
    :
1 - 20 / 243
Next
Sort By: