U.S. flag An official website of the United States government.
Official websites use .gov

A .gov website belongs to an official government organization in the United States.

Secure .gov websites use HTTPS

A lock ( ) or https:// means you've safely connected to the .gov website. Share sensitive information only on official, secure websites.

ITSJPO Digital Library

rosaP Repository & Open Science Access Portal

This collection includes reports from the USDOT Intelligent Transportation Systems Joint Program Office (ITSJPO) research program. As of December 2016, USDOT's ITS research program is focused on two key priorities: Realizing Connected Vehicle Implementation and Advancing Automation. Research areas include Accelerating Deployment, Automation, Connected Vehicles, Emerging Capabilities, Enterprise Data, and Interoperability. For more information on past and current research areas or the ITSJPO Research Program overall, visit http://www.its.dot.gov/. Bookmark this collection:https://rosap.ntl.bts.gov/collection_itsjpo or https://doi.org/10.21949/1530838.

Showing 361 - 380 of 3606 results
  • Mobility on Demand MOD Sandbox Demonstrations Independent Evaluation IEValley Metro Mobility Platform Project Evaluation Plan
  • Connected Vehicle Pilot Deployment Program Phase 2 System Architecture Document Tampa THEA
  • What Is Integrated Corridor Management
  • Development of an AnalysisModelingSimulation AMS Framework for V2I and ConnectedAutomated Vehicle Environment
  • Mobility on Demand MOD Sandbox Demonstrations Independent Evaluation IEPinellas Suncoast Transit Authority PSTAPublic PrivatePartnership for Paratransit Mobility on Demand Demonstration P4MOD Evaluation Plan
  • MOD Sandbox Demonstrations Independent Evaluation IE TriCounty Metropolitan TriMet Transportation District of Oregon  OpenTripPlanner SharedUse Mobility OTP SUM Evaluation Plan
  • Motorcycle Safety and Intelligent Transportation Systems Gap Analysis Final Report
  • Connected Vehicle Procurement State of the Practice Assessment Summary Findings Report Final
  • Connecting Pedestrians with Disabilities to Adaptive Signal Control for Safe Intersection Crossing and Enhanced Mobility 2018 Field Test and Evaluation
  • LowSpeed Automated Shuttles State of the Practice Final Report
  • I35 Freight Advanced Traveler Information System FRATIS Impacts AssessmentFinal Report
  • Development of VehicletoInfrastructure Applications Program Fourth Annual Report
  • Connected Vehicle Pilots Phase 2 Interoperability Test Test Plan
  • Connected Vehicle Pilot Deployment Program Independent Evaluation Analysis Modeling and Simulation PlanTampa
  • Connected Vehicle Pilot Deployment Program Independent Evaluation Analysis Modeling and Simulation PlanWyoming
  • Connecting Pedestrians with Disabilities to Adaptive Signal Control for Safe Intersection Crossing and Enhanced Mobility System Design Document 2018
  • Mobility on Demand MOD Sandbox Demonstrations Independent Evaluation IE  Regional Transportation Authority RTA of Pima County Adaptive Mobility With Reliability and Efficiency AMORE Project Evaluation Plan
  • Connected Vehicle Pilot Deployment Program  Phase 2 Final System Performance Report Baseline Conditions  WYDOT CV Pilot
  • Connected Vehicle Pilot Deployment Program Phase 2 Performance Measurement and Evaluation Support PlanICFWyoming
  • Connected Vehicle Pilot Deployment Program Phase 2 Operational Readiness PlanWYDOT CV Pilot