Connected Vehicle Pilot Deployment Program Phase I: Comprehensive Pilot Deployment Plan: Tampa Hillsborough Expressway Authority (THEA)
-
2019-02-01
-
Details:
-
Alternative Title:Connected Vehicle Pilot Deployment Program Phase 1, Comprehensive Deployment Plan – Tampa (THEA)
-
Creators:
-
Corporate Creators:
-
Corporate Contributors:
-
Subject/TRT Terms:
-
Publication/ Report Number:
-
Resource Type:
-
Geographical Coverage:
-
Edition:Final Report February 2019
-
Corporate Publisher:
-
Abstract:The Tampa Hillsborough Expressway Authority (THEA) Connected Vehicle (CV) Pilot Deployment Program is part of a national effort to advance CV technologies by deploying, demonstrating, testing and offering lessons learned for future deployers. The THEA CV Pilot is developing a suite of CV applications, or apps, that utilize vehicle-to-infrastructure (V2I), vehicle-to-vehicle (V2V) and Vehicle to everything (V2X) communication technology to reduce traffic congestion, improve safety, and decrease emissions. These CV apps support a flexible range of services from advisories, roadside alerts, transit mobility enhancements, and pedestrian safety. The pilot is conducted in three Phases. Phase 1 includes the conceptual planning for the CV pilot, beginning with the Concept of Operations development. Phase 2 is the design, development, and testing phase. Phase 3 includes a real-world demonstration and of the apps developed as part of this pilot.
This document presents the Comprehensive Deployment Plan (CDP). The CDP provides an overview of Phase 1 findings and of Phase 2 and 3 deployment management strategies for infrastructure and CV apps in Tampa. Phase 2 activities include participant recruitment and training; plans and procurement of equipment for installations; stakeholder outreach; performance measurement and independent evaluator support and privacy and data security, among others. Phase 3 activities include stakeholder outreach, performance measurement and independent evaluator support, post-pilot deployment and transition planning. The deployment schedule, project team personnel organization and a cost summary complete the CDP discussion.
-
Format:
-
Funding:
-
Collection(s):
-
Main Document Checksum:
-
Download URL:
-
File Type: