Integrated corridor management initiative : demonstration phase evaluation – San Diego corridor performance analysis test plan.
-
2012-08-01
Details
-
Creators:
-
Corporate Creators:
-
Corporate Contributors:
-
Subject/TRT Terms:
-
Publication/ Report Number:
-
Resource Type:
-
Geographical Coverage:
-
Corporate Publisher:
-
Abstract:This report presents the test plan for conducting the Corridor Performance Analysis for the United States ; Department of Transportation (U.S. DOT) evaluation of the San Diego Integrated Corridor Management ; (ICM) Initiative Demonstration. The ICM projects being deployed in San Diego include a suite of ; strategies aimed at balancing corridor transportation supply and demand to promote overall corridor ; efficiency and safety. Operational strategies to be deployed in the San Diego I-15 highway corridor ; include: simulations to predict travel conditions for improved incident response, interdependent ; response plans among agencies, traffic diversion to strategic arterials, traveler mode shift to the bus ; rapid transit (BRT) system during major freeway incidents, and comparative travel time information to ; the public and operating agencies for freeway, HOT lanes, arterial streets, and BRT. Technologies that ; will be used to carry out these strategies include a Decision Support System, a 511 traveler information ; system (telephone and website), a regional center-to-center information exchange network, dynamic ; message signs, adaptive ramp metering, and responsive traffic signals. This Corridor Performance ; Analysis Test Plan is based on the ICM Initiative Demonstration National Evaluation Framework. ; This test plan provides an overview of the Corridor Performance Analysis and describes the specific ; qualitative and quantitative data that will be collected to support the analysis. Data analysis ; methodologies as well as risks and mitigations associated with this evaluation analysis are also ; discussed in this test plan.
-
Format:
-
Funding:
-
Download URL:
-
File Type:
-
Collection(s):
-
Main Document Checksum:urn:sha-512:2173109a0c273a4b3e5ff867d2d81a82a9bd0ac364e259f494f322ba2fb58515e4b699fae6bad8df97a912566503ae17c74d1e22904c3c5aa5f2c7c53bac261d