Integrated corridor management initiative : demonstration phase evaluation – Dallas corridor performance analysis test plan.
-
2012-08-01
Details
-
Creators:
-
Corporate Creators:
-
Corporate Contributors:
-
Subject/TRT Terms:
-
Publication/ Report Number:
-
Resource Type:
-
Geographical Coverage:
-
Corporate Publisher:
-
Abstract:This report presents the test plan for conducting the Corridor Performance Analysis for the United States ; Department of Transportation (U.S. DOT) evaluation of the Dallas U.S. 75 Integrated Corridor ; Management (ICM) Initiative Demonstration. The ICM projects being deployed in Dallas include a ; suite of strategies aimed at balancing U.S. 75 corridor transportation supply and demand to promote ; overall corridor efficiency and safety. Operational strategies to be deployed in the Dallas U.S. 75 ; highway corridor include: simulations to predict travel conditions for improved incident response, ; interdependent response plans among agencies, traffic diversion to frontage roads and strategic arterials, ; traveler mode shift to the light rail system during major freeway incidents, and comparative travel time ; information to the public and operating agencies for freeway, HOV lanes, frontage roads, arterial streets, ; and light-rail transit lane. Technologies that will be used to carry out these strategies include a Decision ; Support System, a 511 traveler information system (telephone and website), a regional center-to-center ; information exchange network, dynamic message signs, parking management systems, transit signal ; priority and responsive traffic signals. This Corridor Performance Test Plan is based on the ICM ; Initiative Demonstration National Evaluation Framework. This test plan provides an overview of the ; Corridor Performance Analysis and describes the specific qualitative and quantitative data that will be ; collected to support the analysis. Data analysis methodologies as well as risks and mitigations ; associated with this evaluation analysis are also discussed in this test plan.
-
Format:
-
Funding:
-
Download URL:
-
File Type:
-
Collection(s):
-
Main Document Checksum:urn:sha-512:1e4870f9f8fcb869a61456e528a1559596393ef497f975ab6b20d60fdf0d59fadccbf49416f1fb7fd5b9b7f2904e3f2d92317b5719f601b8e70f17c66c010344