Phares, B., Shane, J., Dahlberg, J., & Dang, H. (2014). Methods for Removing Concrete Decks From Bridge Girders (Report No. WBS: 25-1121-0003-134;InTrans Project 12-435). Iowa State University. Institute for Transportation. https://rosap.ntl.bts.gov/view/dot/28183
Phares, Brent, Jennifer Shane, Justin Dahlberg, and Hongtao Dang. Methods for Removing Concrete Decks From Bridge Girders. Report no. WBS: 25-1121-0003-134;InTrans Project 12-435. Iowa State University. Institute for Transportation, 2014. https://rosap.ntl.bts.gov/view/dot/28183.
Phares, Brent, et al. Methods for Removing Concrete Decks From Bridge Girders. Iowa State University. Institute for Transportation, 2014, Report no. WBS: 25-1121-0003-134;InTrans Project 12-435, ROSA P. https://rosap.ntl.bts.gov/view/dot/28183.
With ever tightening budgets and limitations of demolition equipment, states are looking for cost-effective, reliable, and sustainable methods for removing concrete decks from bridges. The goal of this research was to explore such methods. The research team conducted qualitative studies through a literature review, interviews, surveys, and workshops and performed small-scale trials and push-out tests (shear strength evaluations). Interviews with bridge owners and contractors indicated that concrete deck replacement was more economical than replacing an entire superstructure under the assumption that the salvaged superstructure has adequate remaining service life and capacity. Surveys and workshops provided insight into advantages and disadvantages of deck removal methods, information that was used to guide testing. Small-scale trials explored three promising deck removal methods: hydrodemolition, chemical splitting, and peeling.
Phares, B., Shane, J., Dahlberg, J., & Dang, H. (2014). Methods for Removing Concrete Decks From Bridge Girders (Report No. WBS: 25-1121-0003-134;InTrans Project 12-435). Iowa State University. Institute for Transportation. https://rosap.ntl.bts.gov/view/dot/28183
Phares, Brent, Jennifer Shane, Justin Dahlberg, and Hongtao Dang. Methods for Removing Concrete Decks From Bridge Girders. Report no. WBS: 25-1121-0003-134;InTrans Project 12-435. Iowa State University. Institute for Transportation, 2014. https://rosap.ntl.bts.gov/view/dot/28183.
Phares, Brent, et al. Methods for Removing Concrete Decks From Bridge Girders. Iowa State University. Institute for Transportation, 2014, Report no. WBS: 25-1121-0003-134;InTrans Project 12-435, ROSA P. https://rosap.ntl.bts.gov/view/dot/28183.
ROSA P serves as an archival repository of USDOT-published products including scientific
findings, journal articles, guidelines, recommendations, or other information authored or co-authored by
USDOT or funded partners. As a repository, ROSA P retains documents in their original published format to
ensure public access to scientific information.
Links with this icon indicate that you are leaving a Bureau of Transportation
Statistics (BTS)/National Transportation Library (NTL)
Web-based service.
Thank you for visiting.
You are about to access a non-government link outside of
the U.S. Department of Transportation's National
Transportation Library.
Please note: While links to Web sites outside of DOT are
offered for your convenience, when you exit DOT Web sites,
Federal privacy policy and Section 508 of the Rehabilitation
Act (accessibility requirements) no longer apply. In
addition, DOT does not attest to the accuracy, relevance,
timeliness or completeness of information provided by linked
sites. Linking to a Web site does not constitute an
endorsement by DOT of the sponsors of the site or the
products presented on the site. For more information, please
view DOT's Web site linking policy.
To get back to the page you were previously viewing, click
your Cancel button.