Crack Reduction Strategies on a Pavement Warranty Project (Interstate 25 at Fountain, Colorado)
-
2003-03-01
Details
-
Creators:
-
Corporate Creators:
-
Corporate Contributors:
-
Subject/TRT Terms:
-
Publication/ Report Number:
-
Resource Type:
-
Geographical Coverage:
-
Edition:Final Report
-
Corporate Publisher:
-
Abstract:As part of a mandated pavement warranty pilot program, a four-mile segment of I-25 south of Fountain, Colorado was rehabilitated during the summer of 1998. The north and southbound lanes were overlaid with five inches of HBP under a warranty contract. Prior to the overlay, the roadway was milled to a depth of 1 inch over the entire project, with the exception of the first nine test section locations (approximately 3,600 feet) where the driving lane was milled an additional 1-1/2 inch depth (trench section) and after the specific treatments were applied, the trench was overlaid with HBP. Treatments consisted of eight crack prevention methods over the 2-1/2 inch (1-1/2 inch trench in a 1-1/2 inch milled section of the driving lane) as well as the standard 1-inch milled surface. Although a specially assigned Pavement Evaluation Team (PET) evaluated the project's performance, Research became involved in the performance evaluation for the three-year warranty period. The evaluation consisted of project inspection prior to construction, crack prevention treatments during construction, and the three -year post-construction evaluation. Findings confirmed that the least recurrence of cracks was noticed in the "trenched" section that had the additional 1-1/2 inch hot mix pavement. Furthermore, the majority of the recurrent cracking was observed after the first year, with additional cracking becoming visible after the third year.
-
Format:
-
Funding:
-
Download URL:
-
File Type:
-
Collection(s):
-
Main Document Checksum:urn:sha-512:2e8d37e40e508cea62239c54238a6c323fb6bf057efdaeaef0bd071eed986f30f9e09f5ca145feb81a676eb852da3afa00c1c4ace6b9f3b86231591ce4deff95