Santa Clara Valley Transportation Authority (2025). Trips Reliability Improvement and Performance System (TRIPS) Final Implementation Report. Santa Clara Valley Transportation Authority. https://rosap.ntl.bts.gov/view/dot/88732
Santa Clara Valley Transportation Authority. Trips Reliability Improvement and Performance System (TRIPS) Final Implementation Report. Santa Clara Valley Transportation Authority, 2025. https://rosap.ntl.bts.gov/view/dot/88732.
Santa Clara Valley Transportation Authority Trips Reliability Improvement and Performance System (TRIPS) Final Implementation Report. Santa Clara Valley Transportation Authority, 2025, ROSA P. https://rosap.ntl.bts.gov/view/dot/88732.
The Final Implementation Report illustrates how the proof of concept or prototype performed relative to expectations and evaluates whether a full-scale implementation of the CTSP would meet the SMART Program’s goals. The report includes the System Engineering Management Plan that includes the Draft Verification Plan, Draft Memorandum of Understanding, Proof-of-Concept Route 57 Report, Public Engagement Report, and the Centralized Transit Signal Priority Technical Deployment Evaluation.
The datasets contain reports and protype travel time data that were generated as the first phase of the TRIPS project. Reports such as Final Implement
...
The Transit Reliability Improvement and Performance (TRIPS) Stage 1 Data Set contains reports and prototype travel time data generated as the first ph
...
This document provides a rationale for the expected operations of a centralized Transit Signal Priority (TSP) system deployment along various corridor
...
Santa Clara Valley Transportation Authority (2025). Trips Reliability Improvement and Performance System (TRIPS) Final Implementation Report. Santa Clara Valley Transportation Authority. https://rosap.ntl.bts.gov/view/dot/88732
Santa Clara Valley Transportation Authority. Trips Reliability Improvement and Performance System (TRIPS) Final Implementation Report. Santa Clara Valley Transportation Authority, 2025. https://rosap.ntl.bts.gov/view/dot/88732.
Santa Clara Valley Transportation Authority Trips Reliability Improvement and Performance System (TRIPS) Final Implementation Report. Santa Clara Valley Transportation Authority, 2025, ROSA P. https://rosap.ntl.bts.gov/view/dot/88732.
ROSA P serves as an archival repository of USDOT-published products including scientific
findings, journal articles, guidelines, recommendations, or other information authored or co-authored by
USDOT or funded partners. As a repository, ROSA P retains documents in their original published format to
ensure public access to scientific information.
Links with this icon indicate that you are leaving a Bureau of Transportation
Statistics (BTS)/National Transportation Library (NTL)
Web-based service.
Thank you for visiting.
You are about to access a non-government link outside of
the U.S. Department of Transportation's National
Transportation Library.
Please note: While links to Web sites outside of DOT are
offered for your convenience, when you exit DOT Web sites,
Federal privacy policy and Section 508 of the Rehabilitation
Act (accessibility requirements) no longer apply. In
addition, DOT does not attest to the accuracy, relevance,
timeliness or completeness of information provided by linked
sites. Linking to a Web site does not constitute an
endorsement by DOT of the sponsors of the site or the
products presented on the site. For more information, please
view DOT's Web site linking policy.
To get back to the page you were previously viewing, click
your Cancel button.