Cost Effective Alternatives for Mitigating Debris and Environmental Impacts Around Bridge Piers
-
2024-12-01
Details
-
Creators:
-
Corporate Creators:
-
Corporate Contributors:
-
Subject/TRT Terms:
-
Publication/ Report Number:
-
Resource Type:
-
Geographical Coverage:
-
Edition:Final Report
-
Corporate Publisher:
-
Abstract:This research study addressed three key problems: 1) identifying safer, timely, and cost-effective solutions for removing accumulated debris from bridge piers, 2) designing and implementing countermeasures to prevent debris accumulation, and 3) finding technological solutions to enhance bridge inspection, scour detection, and mapping of river cross sections. The project evaluated various equipment solutions for debris removal, ultimately developing and testing a custom knuckle boom crane with grapple and saw attachments. The knuckle boom crane improved worker safety, minimized lane closures, and allowed for streamlined environmental permitting. On small projects completed by ODOT County forces, labor was reduced by 43%. Large or difficult projects that have typically been sold to contractors can now be completed by ODOT forces with cost reductions ~80-90%.
-
Format:
-
Funding:
-
Collection(s):
-
Main Document Checksum:urn:sha-512:385e2976c07986e9c8d0e649eea1f4450f04b363604b76f89a5b748cfd377e14641e9726d41c2e8d9f33a18cdca58f7d3411e1f29616991903d9042faa0ea81b
-
Download URL:
-
File Type: