A Report on the User’s Manual for Diamond Interchange Signalization-PASSER III
-
1977-08-01
-
Details
-
Creators:
-
Corporate Creators:
-
Corporate Contributors:
-
Subject/TRT Terms:
-
Publication/ Report Number:
-
Resource Type:
-
Geographical Coverage:
-
Edition:Interim - September 1975 - August 1976
-
Corporate Publisher:
-
Abstract:This report describes the user's manual for PASSER III, a practical computer program developed to assist the traffic engineer in determining optimal traffic signal timings for pretimed or traffic-responsive, fixed sequence signalized diamond interchanges. The program is applicable to isolated interchanges as well as to a series of interchanges through which progression is desired along the frontage roads. In addition, design engineers may use PASSER III to evaluate the effectiveness of proposed interchange design alternatives. PASSER III can evaluate any signal timing plan that might exist at a signalized diamond interchange. (phasing codes) can be analyzed. Four basic signal phasing sequences A fifth phasing code, phasing code 1A, has the same phasing sequence as code 1, but the green splits are calculated by a different procedure.
-
Format:
-
Funding:
-
Collection(s):
-
Main Document Checksum:urn:sha-512:df630ea9b0eb3d5d4069906743521e64c0fc689d547e5d4e7b66526f3b29ed8a95889a930ede2a49b5a687f67a08b94c4fd3db7aeba0c95a34fa6871e81e4ad6
-
Download URL:
-
File Type: