Catch Basin Inserts for Ohio Roadways
-
2018-09-01
Details:
-
Creators:
-
Corporate Creators:
-
Corporate Contributors:
-
Subject/TRT Terms:
-
Publication/ Report Number:
-
Resource Type:
-
Geographical Coverage:
-
Edition:Final Report, November 2016-September 2018
-
Corporate Publisher:
-
Abstract:Detailed evaluation of roadside catch basin inserts (CBIs) for the removal of TSS. Study consisted of both field and laboratory testing. Field testing evaluated the installation, maintenance and removal needs for CBIs during a year-long installation period. The Lab testing evaluated the sediment retention associated with each CBI. Since none of the units met both the sediment removal and installation requirements, and due to the high effort and cost to maintain, the CBIs tested do not appear to be a viable option to be added as post-construction stormwater BMPs for ODOT.
-
Format:
-
Funding:
-
Collection(s):
-
Main Document Checksum:
-
Download URL:
-
File Type: