Implementation Phase of SPR 777 Study and Guidance for a Chip Seal Performance Specification
-
2021-04-01
Details:
-
Creators:
-
Corporate Creators:
-
Corporate Contributors:
-
Subject/TRT Terms:
-
Publication/ Report Number:
-
Resource Type:
-
Geographical Coverage:
-
Edition:Final Report
-
Corporate Publisher:
-
Abstract:This report outlines the development and implementation phase of chip seal performance specification for Oregon. Two chip seal workshops were held to involve chip seal stakeholders including a variety of Oregon Department of Transportation (ODOT) personnel and contractors. A voluntary survey about the potential specification changes was developed and results are presented. A series of specification meetings were held with ODOT and industry to re-evaluate the specification and potential changes line-by-line. The specifications developed as a result of the specification meetings are presented and specification guidance is provided. Flow charts were developed aid in specification processes and action items. Chip seal design and a design spreadsheet are discussed. Finally, the Oregon DOT conducted a demonstration project under the new specification. The details and results of the demonstration project are presented.
-
Content Notes:This report also contains follow-up work from research in SPR 777 (https://www.oregon.gov/ODOT/Programs/ResearchDocuments/SPR777_ChipSeal.pdf)
-
Format:
-
Collection(s):
-
Main Document Checksum:
-
Download URL:
-
File Type: