Connected Vehicle Pilot Deployment Program Phase 2, Operational Readiness Plan-WYDOT CV Pilot
-
2018-07-30
-
Details:
-
Alternative Title:Wyoming DOT Connected Vehicle Pilot Operational Readiness Plan
-
Creators:
-
Corporate Creators:
-
Corporate Contributors:
-
Subject/TRT Terms:
-
Publication/ Report Number:
-
Resource Type:
-
Geographical Coverage:
-
Edition:Operational Readiness Plan, 09/01/2016 to 3/16/2018
-
Contracting Officer:
-
Corporate Publisher:
-
Abstract:The Wyoming Department of Transportation’s (WYDOT) Connected Vehicle (CV) Pilot Deployment Program is intended to develop a suite of applications that utilize vehicle-to-infrastructure (V2I) and vehicle-to-vehicle (V2V) communication technology to reduce the impact of adverse weather on truck travel in the I-80 corridor. These applications support a flexible range of services from advisories,roadside alerts, parking notifications and dynamic travel guidance. Information from these applications are made available directly to the equipped fleets or through data connections to fleet management centers (who will then communicate it to their trucks using their own systems). The pilot will be conducted in three Phases. Phase 1 includes the planning for the CV pilot including the concept of operations development. Phase 2 is the design, development, and testing phase. Phase 3 includes a real-world demonstration of the applications developed as part of this pilot. This Phase 2 document presents the Operational Readiness Plan which outlines the plan and checklist by which the WYDOT Team will monitor and report the readiness of the WYDOT CV Pilot for full deployment and implementation. This document describes the plans by which the WYDOT CV Pilot Team will verify and demonstrate to USDOT and other stakeholders that the WYDOT Connected Vehicle Pilot Deployment (CVPD) meets performance requirements, is operational, and will be reliable, available, maintainable, and safe. This revised version is an update to an earlier version of the report, reflecting more thoroughly fleshed out concepts and insights gained by the site during and at the end of Phase 2.
-
Format:
-
Funding:
-
Collection(s):
-
Main Document Checksum:
-
Download URL:
-
File Type: