Connected Vehicle Pilot Deployment Program Phase 2 : Comprehensive Maintenance And Operations Plan - Tampa (Thea)
-
2018-05-01
Details:
-
Alternative Title:Connected Vehicle Pilot Deployment Program, Comprehensive Installation Plan - Tampa (THEA)
-
Corporate Creators:
-
Corporate Contributors:
-
Subject/TRT Terms:
-
Publication/ Report Number:
-
Resource Type:
-
Geographical Coverage:
-
Edition:Final Report
-
Contracting Officer:
-
Corporate Publisher:
-
Abstract:This Comprehensive Operations and Maintenance Plan (CMOP) covers planning for the operations and maintenance of all in-vehicle, roadside, mobile device, center, and other equipment and supporting capabilities required in the deployed system. The CMOP also identifies the types and number of equipment required to be maintained and summarizes key operational methods and procedures that ensure safe and efficient operations in Phase 3. Finally, the CMOP provides an overview of the proposed operational methods and processes, a high-level maintenance approach, as well as a high-level plan for inventory and configuration management, including: a. Routine maintenance requirements/schedules; b. Inspection procedures; c. Maintenance/replacement procedures (and responsible entities); d. QA/QC processes; e. Hardware/software configuration control processes; f. Recall processes; and g. Spare parts/warranty contingency plans.
-
Format:
-
Funding:
-
Collection(s):
-
Main Document Checksum:
-
Download URL:
-
File Type: