Connected Vehicle Pilot Deployment Program Phase 2, Performance Measurement and Evaluation Support Plan-ICF/Wyoming
-
2018-07-30
-
Details:
-
Alternative Title:Connected Vehicle Pilot Performance Measurement and Evaluation Support Plan-WYDOT Final
-
Creators:
-
Corporate Creators:
-
Corporate Contributors:
-
Subject/TRT Terms:
-
Publication/ Report Number:
-
Resource Type:
-
Geographical Coverage:
-
Edition:Final Report-July 30, 2018 (phase 2 Update)
-
Contracting Officer:
-
Corporate Publisher:
-
Abstract:The Wyoming Department of Transportation’s (WYDOT) Connected Vehicle (CV) Pilot Deployment Program is intended to develop a suite of applications that utilize vehicle to infrastructure (V2I) and vehicle to vehicle (V2V) communication technology to reduce the impact of adverse weather on truck travel in the I-80 corridor. These applications support a flexible range of services from advisories, roadside alerts, parking notifications and dynamic travel guidance. Information from these applications are made available directly to the equipped fleets or through data connections to fleet management centers (who will then communicate it to their trucks using their own systems). The pilot will be conducted in three Phases. Phase I includes the planning for the CV pilot including the concept of operations development. Phase II is the design, development, and testing phase. Phase III includes a real-world demonstration of the applications developed as part of this pilot. This document presents the performance measurement and evaluation support plan utilized in this pilot. As such, it identifies and describes the measures and corresponding targets, data needed, and evaluation designs that will be used to complete a successful performance measure and evaluation of the WYDOT CV Pilot Demonstration. Additionally, this document will address confounding factors and mitigation approaches, system performance reporting, and data collection and management.
-
Content Notes:Title page shows a publication date of 2018-07-30, while the Technical Report Documentation Page has a 5. Report Date recorded as 2018-06-06. Since 2018-06-06 is included as the closing date in field 13. Period Covered, we have chose 2018-07-30 as the Publication Date.
-
Format:
-
Funding:
-
Collection(s):
-
Main Document Checksum:
-
Download URL:
-
File Type: