Abu-Odeh, A. Y., Smith, C., Ivev, D. L., & Kuhn, D. L. (2017). Optimization of thrie beam terminal end shoe connection (Report No. FHWA/TX-16/9-1002-15-6). Texas Department of Transportation. Research and Technology Implementation Office. https://rosap.ntl.bts.gov/view/dot/32382
Abu-Odeh, Akram Y., Corey Smith, Don L. Ivev, and Darrell L. Kuhn. Optimization of thrie beam terminal end shoe connection. Report no. FHWA/TX-16/9-1002-15-6. Texas Department of Transportation. Research and Technology Implementation Office, 2017. https://rosap.ntl.bts.gov/view/dot/32382.
Abu-Odeh, Akram Y., et al. Optimization of thrie beam terminal end shoe connection. Texas Department of Transportation. Research and Technology Implementation Office, 2017, Report no. FHWA/TX-16/9-1002-15-6, ROSA P. https://rosap.ntl.bts.gov/view/dot/32382.
Terminal thrie end shoes connect nested thrie beams to parapets or other bridge rail structure to provide a robust connectivity between a transition section and a rigid railing section. When connecting terminal end shoe to thrie beam transitions, the thrie section profile results in shifting of the connecting slots. This can result in slots misalignment, which makes installation and maintenance difficult. Multiple field adjustments are known to be used to fit the end shoe to the beam. Such methods include hammering drift pins to deform the metal, or torching or grinding away the interring material, all of which may compromise the integrity of the rail element.
;
The goal of this project is to evaluate existing end shoe design and develop design improvements that will reduce or eliminate the need for field adjustments.
Abu-Odeh, A. Y., Smith, C., Ivev, D. L., & Kuhn, D. L. (2017). Optimization of thrie beam terminal end shoe connection (Report No. FHWA/TX-16/9-1002-15-6). Texas Department of Transportation. Research and Technology Implementation Office. https://rosap.ntl.bts.gov/view/dot/32382
Abu-Odeh, Akram Y., Corey Smith, Don L. Ivev, and Darrell L. Kuhn. Optimization of thrie beam terminal end shoe connection. Report no. FHWA/TX-16/9-1002-15-6. Texas Department of Transportation. Research and Technology Implementation Office, 2017. https://rosap.ntl.bts.gov/view/dot/32382.
Abu-Odeh, Akram Y., et al. Optimization of thrie beam terminal end shoe connection. Texas Department of Transportation. Research and Technology Implementation Office, 2017, Report no. FHWA/TX-16/9-1002-15-6, ROSA P. https://rosap.ntl.bts.gov/view/dot/32382.
ROSA P serves as an archival repository of USDOT-published products including scientific
findings, journal articles, guidelines, recommendations, or other information authored or co-authored by
USDOT or funded partners. As a repository, ROSA P retains documents in their original published format to
ensure public access to scientific information.
Links with this icon indicate that you are leaving a Bureau of Transportation
Statistics (BTS)/National Transportation Library (NTL)
Web-based service.
Thank you for visiting.
You are about to access a non-government link outside of
the U.S. Department of Transportation's National
Transportation Library.
Please note: While links to Web sites outside of DOT are
offered for your convenience, when you exit DOT Web sites,
Federal privacy policy and Section 508 of the Rehabilitation
Act (accessibility requirements) no longer apply. In
addition, DOT does not attest to the accuracy, relevance,
timeliness or completeness of information provided by linked
sites. Linking to a Web site does not constitute an
endorsement by DOT of the sponsors of the site or the
products presented on the site. For more information, please
view DOT's Web site linking policy.
To get back to the page you were previously viewing, click
your Cancel button.