Dynamic flashing yellow arrow (FYA): a study on variable left-turn mode operational and safety impacts phase II - model expansion and testing.
-
2016-06-01
Details
-
Creators:
-
Corporate Creators:
-
Corporate Contributors:
-
Subject/TRT Terms:
-
Resource Type:
-
Geographical Coverage:
-
Corporate Publisher:
-
Abstract:The flashing yellow arrow (FYA) signal display creates an opportunity to enhance the left-turn phase with a ; variable mode that can be changed on demand. The previously developed decision support system (DSS) in ; phase I facilitated the selection of the FYA left-turn mode, changing by time of day at intersections. There was a ; need to continue to refine the interactive framework to improve its service. However, the ultimate objective of ; the continued research of phase II was to demonstrate the ability to execute the automation of the process. Phase ; II of the FYA project provided additional intersection data that refined the work that was previously completed. ; Virtual testing of the DSS was first conducted using VISSIM application programming interface (API) to confirm ; the validity of the procedure and logic. The DSS was then tested in a field testing environment. A custom ; communications software was developed to retrieve instantaneous channel input data, synchronize opposing thru ; green phase, analyze traffic information, provide the algorithm decision, and generate a real-time log recording ; the events. The proposed algorithm is implemented with the goal of safely optimizing traffic operations with ; constant analysis in real-time to determine whether it would be optimal to switch the red arrow to a flashing ; yellow arrow. The algorithm determines the time interval between the successive arrivals of vehicles and ; computes the corresponding headway for each lane by cycle on a second-by-second basis. The DSS was ; ultimately tested at two different intersections in Seminole County. The DSS testing confirmed the applicability ; and validity of the developed DSS as well as the aforementioned procedure, criteria, and logic.
-
Format:
-
Funding:
-
Download URL:
-
File Type:
-
Collection(s):
-
Main Document Checksum:urn:sha256:a9d8ab9ca9933b302f8ca01d811f52cbbda1bb7798b01f102439c4039d3579e0