Assessing MoDOT’s Efforts to Provide the Right Transportation Solution: Tracker Measure 3g [2015]
-
2015-12-01
Details:
-
Creators:
-
Corporate Creators:
-
Corporate Contributors:
-
Subject/TRT Terms:
-
Publication/ Report Number:
-
Resource Type:
-
Geographical Coverage:
-
Corporate Publisher:
-
Abstract:The basic research design for the project was to sample opinions on a variety of projects spread across the state. A small, medium, and large project from each of the seven MoDOT districts was selected by a regional manager for the project for a total of 21 projects. The sample included 600 addresses per project area for a total of 12,600 Missouri addresses being mailed a copy of the survey. Each survey was focused on one of 21 individual projects, which was briefly described on the survey, and the majority of survey questions related to the recently completed project, such as determining if the completion of the project increased safety, convenience, and made it easier to drive.
-
Format:
-
Funding:
-
Collection(s):
-
Main Document Checksum:
-
Download URL:
-
File Type: