Vonderohe, A. P. (2008). Implementation of GPS controlled highway construction equipment phase II (Report No. CFIRE 02-12). National Center for Freight and Infrastructure Research and Education (U.S.). https://rosap.ntl.bts.gov/view/dot/25337
Vonderohe, Alan P.. Implementation of GPS controlled highway construction equipment phase II. Report no. CFIRE 02-12. National Center for Freight and Infrastructure Research and Education (U.S.), 2008. https://rosap.ntl.bts.gov/view/dot/25337.
Vonderohe, Alan P. Implementation of GPS controlled highway construction equipment phase II. National Center for Freight and Infrastructure Research and Education (U.S.), 2008, Report no. CFIRE 02-12, ROSA P. https://rosap.ntl.bts.gov/view/dot/25337.
"During 2006, WisDOT and the Construction Materials and Support Center at UW-Madison worked together to develop
;
a specification and QC/QA procedures for GPS machine guidance on highway construction grading operations. These
;
specifications and procedures are intended for incorporation in contracts on two to five pilot projects during the 2007
;
construction season. The 2006 work, and the 2007 pilot projects are the first two steps in a phased implementation plan
;
that includes refinement of the specification and procedures after the 2007 pilots, additional pilots during 2008, and
;
potential statewide implementation of optional GPS machine guidance for grading on 2009 contracts.
;
To be effective, the goals, objectives, and methods for data collection and analysis for the 2007 pilot projects must be
;
well-articulated; the project sites must be carefully selected; and a set of deliverables and management plan for
;
coordination of the effort must be developed."
Vonderohe, A. P. (2008). Implementation of GPS controlled highway construction equipment phase II (Report No. CFIRE 02-12). National Center for Freight and Infrastructure Research and Education (U.S.). https://rosap.ntl.bts.gov/view/dot/25337
Vonderohe, Alan P.. Implementation of GPS controlled highway construction equipment phase II. Report no. CFIRE 02-12. National Center for Freight and Infrastructure Research and Education (U.S.), 2008. https://rosap.ntl.bts.gov/view/dot/25337.
Vonderohe, Alan P. Implementation of GPS controlled highway construction equipment phase II. National Center for Freight and Infrastructure Research and Education (U.S.), 2008, Report no. CFIRE 02-12, ROSA P. https://rosap.ntl.bts.gov/view/dot/25337.
ROSA P serves as an archival repository of USDOT-published products including scientific
findings, journal articles, guidelines, recommendations, or other information authored or co-authored by
USDOT or funded partners. As a repository, ROSA P retains documents in their original published format to
ensure public access to scientific information.
Links with this icon indicate that you are leaving a Bureau of Transportation
Statistics (BTS)/National Transportation Library (NTL)
Web-based service.
Thank you for visiting.
You are about to access a non-government link outside of
the U.S. Department of Transportation's National
Transportation Library.
Please note: While links to Web sites outside of DOT are
offered for your convenience, when you exit DOT Web sites,
Federal privacy policy and Section 508 of the Rehabilitation
Act (accessibility requirements) no longer apply. In
addition, DOT does not attest to the accuracy, relevance,
timeliness or completeness of information provided by linked
sites. Linking to a Web site does not constitute an
endorsement by DOT of the sponsors of the site or the
products presented on the site. For more information, please
view DOT's Web site linking policy.
To get back to the page you were previously viewing, click
your Cancel button.