Development of performance-based evaluation methods and specifications for roadside maintenance.
-
2011-01-01
-
Details:
-
Alternative Title:Performance based roadside maintenance specifications
-
Creators:
-
Corporate Creators:
-
Corporate Contributors:
-
Subject/TRT Terms:
-
Publication/ Report Number:
-
Resource Type:
-
Geographical Coverage:
-
Edition:Technical report; Oct. 2008-Aug. 2010.
-
Corporate Publisher:
-
Abstract:This report documents the work performed during Project 0-6387, “Performance Based Roadside
Maintenance Specifications.” Quality assurance methods and specifications for roadside performance-based
maintenance contracts (PBMCs) were developed for potential use by TxDOT. These methods include a set
of performance standards and timeliness requirements, a statistical condition assessment method for
evaluating compliance with these performance standards, and a method for developing performance-based
pay adjustment formulas. The developed performance standards, condition assessment method, and pay
adjustment formulas were tested and refined using field trials. The field trials consisted of five 10-mi
roadway segments located in TxDOT’s Dallas, El Paso, San Antonio, Tyler, and Waco Districts. Finally,
current practices in best-value bid evaluation methods for procuring PBMCs were identified and evaluated
using simulation techniques.
-
Format:
-
Collection(s):
-
Main Document Checksum:
-
Download URL:
-
File Type: