TH-36 full closure construction evaluation of traffic operations alternatives.
-
2010-01-01
Details
-
Creators:
-
Corporate Creators:
-
Corporate Contributors:
-
Subject/TRT Terms:
-
Publication/ Report Number:
-
Resource Type:
-
Geographical Coverage:
-
Corporate Publisher:
-
Abstract:According to the 2007 Urban Mobility Report, $78 billion was lost due to congestion on urban roadways. Many ; urban corridors around the country experience demand that is close to or greater than the available capacity. ; Although most agree that the transportation system has matured and that we will not build ourselves out of ; congestion, existing infrastructure still often requires expansion. Such expansion in an already developed system ; most likely does not involve new roadway construction but results in existing roadway upgrades. Such roadways ; normally already serve considerable demand, a fact that increases the importance of the impact to the roadway ; users, estimated as Road User Costs (RUCs), and raises safety concerns both for the driving public as well as for ; the people working on reconstruction projects. New construction methods like Full Road Closure claim to reduce ; RUCs as well as reduce capital costs. This project follows the first large-scale Full Closure in Minnesota in an ; attempt to learn from the experience and propose the most appropriate tools and methodologies for planning, ; staging, and executing the construction. For the latter, three traffic analysis tools are selected for estimating RUCs ; due to the construction project. Their effort and data requirements, as well as their accuracy is evaluated and ; compared to the empirical, engineering-judgment-based, method used by Mn/DOT. ; 17. Document
-
Format:
-
Funding:
-
Download URL:
-
File Type:
-
Collection(s):
-
Main Document Checksum:urn:sha256:bc008bf96a681f1945e7718072ddb386b6a21262ebc9c7d3e35184a0e765529c