In-situ culvert rehabilitation : synthesis study and field evaluation.
Advanced Search
Select up to three search categories and corresponding keywords using the fields to the right. Refer to the Help section for more detailed instructions.

Search our Collections & Repository

All these words:

For very narrow results

This exact word or phrase:

When looking for a specific result

Any of these words:

Best used for discovery & interchangable words

None of these words:

Recommended to be used in conjunction with other fields

Language:

Dates

Publication Date Range:

to

Document Data

Title:

Document Type:

Library

Collection:

Series:

People

Author:

Help
Clear All

Query Builder

Query box

Help
Clear All

For additional assistance using the Custom Query please check out our Help Page

i

In-situ culvert rehabilitation : synthesis study and field evaluation.

Filetype[PDF-2.18 MB]


  • English

  • Details:

    • Publication/ Report Number:
    • Resource Type:
    • Geographical Coverage:
    • Abstract:
      This synthesis study evaluated culvert rehabilitation (repair) methods involving trenchless technologies that may be appropriate for use in Utah. This report is not intended as a replacement for installation manuals provided by the manufacturers but rather provides a brief description of each method, installation procedures, and highlights the advantages and disadvantages of each. Segmental lining is cost effective in Utah and the most common method of culvert rehabilitation in most western state highway culverts. Cured-in-place pipe and fold-and-form methods are also common but the costs are higher than segmental lining. DOT maintenance personnel can often carry out segmental lining, while contractors with specialized skills and equipment are required for all other methods. This report also presents a survey of culvert relining project costs (western states) and a discussion on burial depth limitations and end treatments. The information provided was obtained through a literature review, surveys of various western State DOTs and interaction with the Utah Department of Transportation (UDOT). A flip chart and installation video were developed for segmental lining as part of this study, with the majority of effort coming from UDOT personnel. Table 1 at the end of the report summarizes the main disadvantages, advantages, and limitations for each culvert relining method.
    • Format:
    • Funding:
    • Main Document Checksum:
    • File Type:

    Supporting Files

    • No Additional Files

    More +

    You May Also Like

    Checkout today's featured content at rosap.ntl.bts.gov

    Version 3.26