Advanced quality systems : probabilistic optimization for profit (Prob.O.Prof) software
Advanced Search
Select up to three search categories and corresponding keywords using the fields to the right. Refer to the Help section for more detailed instructions.

Search our Collections & Repository

For very narrow results

When looking for a specific result

Best used for discovery & interchangable words

Recommended to be used in conjunction with other fields

Dates

to

Document Data
Library
People
Clear All
Clear All

For additional assistance using the Custom Query please check out our Help Page

i

Advanced quality systems : probabilistic optimization for profit (Prob.O.Prof) software

Filetype[PDF-1.34 MB]


English

Details:

  • Creators:
  • Corporate Creators:
  • Corporate Contributors:
  • Subject/TRT Terms:
  • Publication/ Report Number:
  • Resource Type:
  • Edition:
    Final report
  • Contracting Officer:
  • Corporate Publisher:
  • NTL Classification:
    NTL-HIGHWAY/ROAD TRANSPORTATION-Pavement Management and Performance;NTL-HIGHWAY/ROAD TRANSPORTATION-Design;
  • Abstract:
    Contractors constantly have to make decisions regarding how to maximize profit and minimize risk on paving projects. With more and more States adopting incentive/disincentive pay adjustment provisions for quality, as measured by various acceptance quality characteristics (AQCs), a contractor likely has to evaluate several options before selecting an optimum target quality that accomplishes this goal. The greater the number of AQCs, the more complex the assessment the contractor is required to perform, and the less intuition and experience can be relied upon. Highway agencies also need to evaluate their specifications to determine the appropriateness of the process and criteria, and to ensure that the specifications do not have any undesirable consequences. If, for example, an agency learns that there is an economic benefit for contractors to construct pavements at substandard quality levels because of inadequate disincentives, then the agency may need to adjust the specification pay schedule accordingly. Prob.O.Prof 2.0 is a newly developed software tool that can be used by contractors and agencies alike to make keen business decisions regarding the levels of pavement quality to target. This probabilistic, Microsoft Excel®-based program is an enhancement of the original Prob.O.Prof program, developed as part of a Ph.D. dissertation at the University of Florida (Vidalis et al., 2006). It entails a major expansion of the original program through the incorporation of three additional State department of transportation (DOT) portland cement concrete (PCC) pavement specifications and the introduction of four State DOT hot mix asphalt (HMA) pavement specifications. As a result of this expansion, other forms of quality measures besides percent within limits (PWL), such as average absolute deviation (AAD), averages, and average minus standard deviation, can be evaluated, along with other AQCs and pay factor schedules.
  • Format:
  • Funding:
  • Collection(s):
  • Main Document Checksum:
  • Download URL:
  • File Type:

Supporting Files

  • No Additional Files
More +

You May Also Like

Checkout today's featured content at rosap.ntl.bts.gov