Precast Concrete Paving Panels: The Colorado Department of Transportation Region 4 Experience, 2000 to 2006
-
2006-08-01
Details
-
Creators:
-
Corporate Creators:
-
Corporate Contributors:
-
Subject/TRT Terms:
-
Publication/ Report Number:
-
Resource Type:
-
Geographical Coverage:
-
Edition:Final Report: 2000 to 2006
-
Corporate Publisher:
-
Abstract:Beginning with a pilot project in December 2000, the Colorado Department of Transportation, Region 4 (northeast corner of Colorado), pursued the use of precast concrete panels as a means to speed repair of concrete pavements. The outcome of the repair techniques occurring within 8 to 9 hours has provided a means to minimize traffic disruption at peak traffic hours. A description of construction concerns and techniques is included. While a high success rate has occurred with thicker panel depths (8 inches and above), shallower panel depths ( 7 inches and below) have had a higher failure rate than was expected. Panels have been installed in high traffic areas principally I-25 north of Denver. Additional sites with fewer panels have been on US Hwy 287 north of Fort Collins and US Hwy 85 near Greeley.
-
Format:
-
Collection(s):
-
Main Document Checksum:urn:sha-512:4db20ea36bcb422472f09fab4951a8bda37e116c92fff5236040540f3a96317bef9137834455997469435bf5adc266d016ec26e5661787e8baae3a0516d959b2
-
Download URL:
-
File Type: