Concrete Overlay on I-35 Forest Lake, MN: Summary Report
-
2018-07-01
Details
-
Corporate Creators:
-
Subject/TRT Terms:
-
Publication/ Report Number:
-
Resource Type:
-
Right Statement:
-
Geographical Coverage:
-
Corporate Publisher:
-
Abstract:The Federal Highway Administration (FHWA) Mobile Concrete Trailer (MCT) visited the concrete overlay project over I-35 in Forest Lake, MN from July 16 through 26 at the request of Maria Masten with the Minnesota Department of Transportation. The objective of the MCT visit was to demonstrate innovative technologies currently in the implementation phase; this is in conjunction with the work being done on this project using FHWA Performance Engineered Mixtures Implementation Incentive funding. This report summarizes the test results, observations, and other activities conducted during this visit. Numerical values of the test results are presented in the Appendix.
-
Format:
-
Collection(s):
-
Main Document Checksum:urn:sha-512:93889e309136fa19576c65d9eee42c48b46a9822f7159f1146dc5ee36a4386871feb5321f1f011a7fd9ef0ecbe6a537e47de00504f11a1f2e128cc399f1d45f2
-
Download URL:
-
File Type: