I-70 Reconstruction Grainfield, KS: Summary Report
-
2019-08-01
Details
-
Corporate Creators:
-
Subject/TRT Terms:
-
Publication/ Report Number:
-
Resource Type:
-
Right Statement:
-
Geographical Coverage:
-
Corporate Publisher:
-
Abstract:The Federal Highway Administration (FHWA) Mobile Concrete Technology Center (MCTC) visited the I-70 pavement replacement project in Grainfield, Kansas from July 29 to August 8, 2019. The objective of the MCTC visit was to demonstrate innovative technologies currently in the implementation phase; this site visit is in conjunction with monitoring and testing work being done on this project using FHWA Performance Engineered Mixtures (PEM) Implementation Incentive funding. During this visit, the MCTC conducted a PEM Open House on August 8, 2019 in coordination with the National Concrete Pavement Technology Center (CP Tech Center), and Todd LaTorella of the Missouri-Kansas Concrete Paving Association. A planned companion workshop titled "Ensuring Quality in the Concrete Paving Process" has been deferred until in-person training events can be held. This report summarizes the test results, observations, and other activities conducted during this visit. Numerical values of the test results are presented in the Appendices.
-
Format:
-
Collection(s):
-
Main Document Checksum:urn:sha-512:cc9fb081fd437f0e7fc5cc83fe82b56d1b9c979a2983ca4961251e153ae67d640522078f76b2ea19344b4c2927a4810c0d0d6d57d784c300b6a976259a92a5ef
-
Download URL:
-
File Type: