U.S. flag An official website of the United States government.
Official websites use .gov

A .gov website belongs to an official government organization in the United States.

Secure .gov websites use HTTPS

A lock ( ) or https:// means you've safely connected to the .gov website. Share sensitive information only on official, secure websites.

i

Understanding Causes of Concrete Culvert Pipe Joint Separation

File Language:
English


Details

  • Creators:
  • Corporate Creators:
  • Corporate Contributors:
  • Subject/TRT Terms:
  • Publication/ Report Number:
  • Resource Type:
  • Geographical Coverage:
  • Edition:
    Final Report
  • Corporate Publisher:
  • Abstract:
    Joint separations affect approximately 20% of the Minnesota concrete pipe inventory (Taylor and Marr 2012). The goals of this research are to determine the factors that contribute to joint separation and recommend practices to mitigate this problem. Research efforts follow a three-pronged approach: (1) Examination of TAMS HydInfra database; (2) field survey of concrete culverts; and (3) computational modeling of soil-culvert systems. Database investigations were conducted using a Random Forest model along with individual feature analysis to determine factors that correlate with joint separations. Geographic features such as the county and route number of the culvert are more important for predicting joint separation than geometric features such as culvert size or cover depth. Field surveys reveal that separations typically occurred at the ends of pipes, or in the first untied joint from the end of the pipe if only some joints were tied. Joint separation was often observed alongside other distress such as infiltration or inslope voids. Computational modeling results show that embankment self-weight and traffic loading concentrate their highest demands under the center of the road, which did not match with field inspections. Soil freezing or changes of water-table level impose greater demands than traffic, and these maximum demands are located at the pipe ends, and thus these mechanisms are more likely to result in joint separation. Recommendations include tying all joints on installation, properly compacting the backfill, and limiting freezing expansion of the embankment materials, particularly if a cohesive soil cap is used.
  • Format:
    PDF
  • Funding:
  • Collection(s):
  • Main Document Checksum:
    urn:sha-512:f2d12682f260958ba435ad788dd1733efdc0aed7062dec222e54310908f7bd6b6e0270c942f50b2986212834a4b1816b1b3be71afea55a76452e113be70b11b8
  • Download URL:
  • File Type:
    Filetype[PDF - 9.34 MB ]
File Language:
English
ON THIS PAGE
 Found an issue?
Send us an email at:
ROSA P serves as an archival repository of USDOT-published products including scientific findings, journal articles, guidelines, recommendations, or other information authored or co-authored by USDOT or funded partners. As a repository, ROSA P retains documents in their original published format to ensure public access to scientific information.