Discarded Tires in Highway Construction
-
1982-11-01
Details
-
Creators:
-
Corporate Creators:
-
Corporate Contributors:
-
Subject/TRT Terms:
-
Publication/ Report Number:
-
Resource Type:
-
Geographical Coverage:
-
Edition:Interim Report
-
Corporate Publisher:
-
Abstract:This report discusses a single bituminous surface treatment using an asphalt-rubber binder and pre-coated aggregate over a bleeding and cracked asphalt concrete highway. Tests and evaluations include: a pavement condition rating, core sample descriptions, subgrade soils, pavement deflection measurements and pavement serviceability. An asphalt-rubber single bituminous surface treatment is more than twice the cost of a standard surface treatment. The asphalt-rubber treatment will have a three year evaluation. The roadway condition and the cost effectiveness will be evaluated at the end of that time period.
-
Format:
-
Funding:
-
Collection(s):
-
Main Document Checksum:urn:sha-512:4ef89992a928c61786949ab150b708abbd1234994bfb8b4d5c2764d7f0fbe3f7468e068bf325e9ae224c8fad75f3b9430c83808d77101b1bd58aab11c9ac9bdd
-
Download URL:
-
File Type: