Transportation of Hazardous Materials Through Eisenhower-Edwin C Johnson Memorial Tunnel – Study (Executive Summary Only)
-
2020-12-01
-
Details
-
Creators:
-
Corporate Creators:
-
Corporate Contributors:
-
Subject/TRT Terms:
-
Publication/ Report Number:
-
Resource Type:
-
Geographical Coverage:
-
Edition:Final Report: (June - December 2020)
-
Corporate Publisher:
-
Abstract:Senate Bill (SB) 19-032 required CDOT to conduct a study assessing the feasibility of allowing the transportation of hazardous materials through EJMT and to prepare a study report that includes the findings and recommendations as to whether and under what conditions the transportation of hazmat through the tunnel could be allowed.
-
Format:
-
Funding:
-
Collection(s):
-
Main Document Checksum:urn:sha-512:baffb468e6be7815745eb4c4c6a2a9984b4369e183f9b11e070709d14e4655ec663edf378b7349b8bc7f598c9d7fa2ff0b410a07f85f4c219ce5a3dda9cab032
-
Download URL:
-
File Type: