Action: Inspection of Non-Structural Tunnel Elements Located above Roadways
-
2020-11-06
-
Series: Memoranda & Guidance: Guidance
Details:
-
Corporate Creators:
-
Subject/TRT Terms:
-
Series:
-
Resource Type:
-
Right Statement:
-
Geographical Coverage:
-
Corporate Publisher:
-
Abstract:The purpose of this memo is to notify tunnel owners of the circumstances of the February 21, 2018 fatal crash in the Lehigh Tunnel and to emphasize the importance of inspecting, documenting, and promptly repairing significant corrosion in nonstructural tunnel elements located above roadways.
-
Format:
-
Collection(s):
-
Main Document Checksum:
-
Download URL:
-
File Type: