Messer, C. J., Hogg, G. L., Chaudhary, N. A., & Chang, E. C. P. (1986). Optimization of Left Turn Phase Sequence in Signalized Networks Using MAXBAND 86. Volume 1. Summary Report (Report No. FHWA/RD-84/082). United States. Department of Transportation. Federal Highway Administration. Offices of Research and Development. https://rosap.ntl.bts.gov/view/dot/88404
Messer, Carroll J., Gary L. Hogg, Nadeem A. Chaudhary, and Edmond C. P. Chang. Optimization of Left Turn Phase Sequence in Signalized Networks Using MAXBAND 86. Volume 1. Summary Report. Report no. FHWA/RD-84/082. United States. Department of Transportation. Federal Highway Administration. Offices of Research and Development, 1986. https://rosap.ntl.bts.gov/view/dot/88404.
Messer, Carroll J., et al. Optimization of Left Turn Phase Sequence in Signalized Networks Using MAXBAND 86. Volume 1. Summary Report. United States. Department of Transportation. Federal Highway Administration. Offices of Research and Development, 1986, Report no. FHWA/RD-84/082, ROSA P. https://rosap.ntl.bts.gov/view/dot/88404.
MAXBAND has been enhanced to provide optimal traffic signal timing plans for general grid networks, using bandwidth as the criterion. The program is user friendly and has several new features. Grid networks as large as 20 arterials with up to 20 signalized intersections per arterial could be solved, but present specifications limit the number of signals in the network to SO until more operational experience with the system is obtained. Phase sequence optimization is provided together with NEMA, eight-phase numbering. MAXBAND 86 is written in FORTRAN 77. Volume 1, Summary Report, provides the basic model theory for calculating progression bandwidths in arterials. Additional material describes how the arterial model formulation is integrated into closed network analysis using closed loop equations. An overview of MAXBAND input, operational and output features are provided.
Messer, C. J., Hogg, G. L., Chaudhary, N. A., & Chang, E. C. P. (1986). Optimization of Left Turn Phase Sequence in Signalized Networks Using MAXBAND 86. Volume 1. Summary Report (Report No. FHWA/RD-84/082). United States. Department of Transportation. Federal Highway Administration. Offices of Research and Development. https://rosap.ntl.bts.gov/view/dot/88404
Messer, Carroll J., Gary L. Hogg, Nadeem A. Chaudhary, and Edmond C. P. Chang. Optimization of Left Turn Phase Sequence in Signalized Networks Using MAXBAND 86. Volume 1. Summary Report. Report no. FHWA/RD-84/082. United States. Department of Transportation. Federal Highway Administration. Offices of Research and Development, 1986. https://rosap.ntl.bts.gov/view/dot/88404.
Messer, Carroll J., et al. Optimization of Left Turn Phase Sequence in Signalized Networks Using MAXBAND 86. Volume 1. Summary Report. United States. Department of Transportation. Federal Highway Administration. Offices of Research and Development, 1986, Report no. FHWA/RD-84/082, ROSA P. https://rosap.ntl.bts.gov/view/dot/88404.
ROSA P serves as an archival repository of USDOT-published products including scientific
findings, journal articles, guidelines, recommendations, or other information authored or co-authored by
USDOT or funded partners. As a repository, ROSA P retains documents in their original published format to
ensure public access to scientific information.
Links with this icon indicate that you are leaving a Bureau of Transportation
Statistics (BTS)/National Transportation Library (NTL)
Web-based service.
Thank you for visiting.
You are about to access a non-government link outside of
the U.S. Department of Transportation's National
Transportation Library.
Please note: While links to Web sites outside of DOT are
offered for your convenience, when you exit DOT Web sites,
Federal privacy policy and Section 508 of the Rehabilitation
Act (accessibility requirements) no longer apply. In
addition, DOT does not attest to the accuracy, relevance,
timeliness or completeness of information provided by linked
sites. Linking to a Web site does not constitute an
endorsement by DOT of the sponsors of the site or the
products presented on the site. For more information, please
view DOT's Web site linking policy.
To get back to the page you were previously viewing, click
your Cancel button.