Benson, F. C., Gallaway, B. M., & Saylak, D. (1983). Sulphur Extended Asphalt Field Trials on MH 153, Brazos County, Texas. Progress Report No. 8 (Report No. 1-10-78-536-8). Texas Transportation Institute. Texas A&M University. https://rosap.ntl.bts.gov/view/dot/86400
Benson, F. C., B. M. Gallaway, and D. Saylak. Sulphur Extended Asphalt Field Trials on MH 153, Brazos County, Texas. Progress Report No. 8. Report no. 1-10-78-536-8. Texas Transportation Institute. Texas A&M University, 1983. https://rosap.ntl.bts.gov/view/dot/86400.
Benson, F. C., et al. Sulphur Extended Asphalt Field Trials on MH 153, Brazos County, Texas. Progress Report No. 8. Texas Transportation Institute. Texas A&M University, 1983, Report no. 1-10-78-536-8, ROSA P. https://rosap.ntl.bts.gov/view/dot/86400.
The major purpose of this project was to conduct construction and post-construction testing and evaluation of a sulfur extended asphalt (SEA) experimental test section located on MH 153 (Wellborn Road in the cities of Bryan and College Station) in Brazos County, Texas. This section of roadway was in District 17 of the Texas State Department of Highways and Public Transportation (SDHPT) during planning and construction.
There were three main objectives of this study of the sulfur extended asphalt field trials on MH 153 in Brazos County, Texas. These objectives are sta
...
The major purpose of this project is to conduct both construction and post-construction testing and evaluation of sulfur extended asphalt (SEA) experi
...
The major purpose of this project was to conduct construction and post-construction testing and evaluation of a sulfur extended asphalt (SEA) experime
...
There were three main objectives of this study of the sulfur extended asphalt field trials on MH 153 in Brazos County, Texas. These objectives are sta
...
Benson, F. C., Gallaway, B. M., & Saylak, D. (1983). Sulphur Extended Asphalt Field Trials on MH 153, Brazos County, Texas. Progress Report No. 8 (Report No. 1-10-78-536-8). Texas Transportation Institute. Texas A&M University. https://rosap.ntl.bts.gov/view/dot/86400
Benson, F. C., B. M. Gallaway, and D. Saylak. Sulphur Extended Asphalt Field Trials on MH 153, Brazos County, Texas. Progress Report No. 8. Report no. 1-10-78-536-8. Texas Transportation Institute. Texas A&M University, 1983. https://rosap.ntl.bts.gov/view/dot/86400.
Benson, F. C., et al. Sulphur Extended Asphalt Field Trials on MH 153, Brazos County, Texas. Progress Report No. 8. Texas Transportation Institute. Texas A&M University, 1983, Report no. 1-10-78-536-8, ROSA P. https://rosap.ntl.bts.gov/view/dot/86400.
ROSA P serves as an archival repository of USDOT-published products including scientific
findings, journal articles, guidelines, recommendations, or other information authored or co-authored by
USDOT or funded partners. As a repository, ROSA P retains documents in their original published format to
ensure public access to scientific information.
Links with this icon indicate that you are leaving a Bureau of Transportation
Statistics (BTS)/National Transportation Library (NTL)
Web-based service.
Thank you for visiting.
You are about to access a non-government link outside of
the U.S. Department of Transportation's National
Transportation Library.
Please note: While links to Web sites outside of DOT are
offered for your convenience, when you exit DOT Web sites,
Federal privacy policy and Section 508 of the Rehabilitation
Act (accessibility requirements) no longer apply. In
addition, DOT does not attest to the accuracy, relevance,
timeliness or completeness of information provided by linked
sites. Linking to a Web site does not constitute an
endorsement by DOT of the sponsors of the site or the
products presented on the site. For more information, please
view DOT's Web site linking policy.
To get back to the page you were previously viewing, click
your Cancel button.