Rossbach, P., & Nelson, A. (2022). Standards Updates for Single Span Prefabricated Bridges — Technology Transfer Technical Brief (Report No. TR-663 (Phase 1);TR-734 (Phase II)). Iowa Highway Research Board. https://rosap.ntl.bts.gov/view/dot/83807
Rossbach, Phil and Al Nelson. Standards Updates for Single Span Prefabricated Bridges — Technology Transfer Technical Brief. Report no. TR-663 (Phase 1);TR-734 (Phase II). Iowa Highway Research Board, 2022. https://rosap.ntl.bts.gov/view/dot/83807.
Rossbach, Phil, and Al Nelson Standards Updates for Single Span Prefabricated Bridges — Technology Transfer Technical Brief. Iowa Highway Research Board, 2022, Report no. TR-663 (Phase 1);TR-734 (Phase II), ROSA P. https://rosap.ntl.bts.gov/view/dot/83807.
Standards for Single Span Prefabricated Bridges were developed by HDR for the Iowa Department of Transportation in 2016 for the use on the county road system. These standards incorporated single span precast or precast/pretensioned concrete box beams with span lengths ranging from 30-feet to 70-feet, clear roadway widths of 24-feet and 30-feet, and skews of 0o, 150 or 30o. Additionally, the standards provided both cast-in-place and precast abutment design options founded on steel H-piles. The abutment designs allowed for either steel sheet pile or concrete wing walls for the 0o skew bridges, with concrete wingwalls only for abutments at a 15o or 30o skew. The standards were developed utilizing the MicroStation V8i CADD software.
Rossbach, P., & Nelson, A. (2022). Standards Updates for Single Span Prefabricated Bridges — Technology Transfer Technical Brief (Report No. TR-663 (Phase 1);TR-734 (Phase II)). Iowa Highway Research Board. https://rosap.ntl.bts.gov/view/dot/83807
Rossbach, Phil and Al Nelson. Standards Updates for Single Span Prefabricated Bridges — Technology Transfer Technical Brief. Report no. TR-663 (Phase 1);TR-734 (Phase II). Iowa Highway Research Board, 2022. https://rosap.ntl.bts.gov/view/dot/83807.
Rossbach, Phil, and Al Nelson Standards Updates for Single Span Prefabricated Bridges — Technology Transfer Technical Brief. Iowa Highway Research Board, 2022, Report no. TR-663 (Phase 1);TR-734 (Phase II), ROSA P. https://rosap.ntl.bts.gov/view/dot/83807.
ROSA P serves as an archival repository of USDOT-published products including scientific
findings, journal articles, guidelines, recommendations, or other information authored or co-authored by
USDOT or funded partners. As a repository, ROSA P retains documents in their original published format to
ensure public access to scientific information.
Links with this icon indicate that you are leaving a Bureau of Transportation
Statistics (BTS)/National Transportation Library (NTL)
Web-based service.
Thank you for visiting.
You are about to access a non-government link outside of
the U.S. Department of Transportation's National
Transportation Library.
Please note: While links to Web sites outside of DOT are
offered for your convenience, when you exit DOT Web sites,
Federal privacy policy and Section 508 of the Rehabilitation
Act (accessibility requirements) no longer apply. In
addition, DOT does not attest to the accuracy, relevance,
timeliness or completeness of information provided by linked
sites. Linking to a Web site does not constitute an
endorsement by DOT of the sponsors of the site or the
products presented on the site. For more information, please
view DOT's Web site linking policy.
To get back to the page you were previously viewing, click
your Cancel button.