Rapid Bridge Deck Joint Repair Investigation – Phase III [Tech Transfer Summary]
-
2020-12-01
Details
-
Creators:
-
Corporate Creators:
-
Corporate Contributors:
-
Subject/TRT Terms:
-
Publication/ Report Number:
-
Resource Type:
-
Geographical Coverage:
-
Edition:Tech Transfer Summary
-
Corporate Publisher:
-
Abstract:The deck over backwall concept is a promising alternative to expansion joints that can both minimize the concrete removal needed for rehabilitation and prevent corrosives from penetrating the bridge’s substructure.
-