Abu-Farsakh, M. Y., & Zhang, Z. (2019). Accelerated Load Testing of Geosynthetic Base Reinforced/Stabilized Unpaved and Pavement Test Sections [Tech Summary] (Report No. State Project No. 736-99-1735 / LTRC Project No. 11-3GT). Louisiana Transportation Research Center. https://rosap.ntl.bts.gov/view/dot/66186
Abu-Farsakh, Murad Y. and Zhongjie Zhang. Accelerated Load Testing of Geosynthetic Base Reinforced/Stabilized Unpaved and Pavement Test Sections [Tech Summary]. Report no. State Project No. 736-99-1735 / LTRC Project No. 11-3GT. Louisiana Transportation Research Center, 2019. https://rosap.ntl.bts.gov/view/dot/66186.
Abu-Farsakh, Murad Y., and Zhongjie Zhang Accelerated Load Testing of Geosynthetic Base Reinforced/Stabilized Unpaved and Pavement Test Sections [Tech Summary]. Louisiana Transportation Research Center, 2019, Report no. State Project No. 736-99-1735 / LTRC Project No. 11-3GT, ROSA P. https://rosap.ntl.bts.gov/view/dot/66186.
Roads in Louisiana are often built over weak subgrade soils due to the soft nature of subsurface soils and the presence of high water tables, which create many design and construction challenges. A common practice in Louisiana is to stabilize/treat the upper part of subgrade with cement or lime, depending on the subgrade soil type. This practice can help reduce the risks of excessive permanent deformations (rutting) by spreading the tire pressure into a wider area, thus reducing the vertical pressure on top of the untreated subgrade layer.
This research study aims at evaluating the benefits of using geosynthetics to reinforce/stabilize base aggregate layer/subgrade in pavements under rep
...
Abu-Farsakh, M. Y., & Zhang, Z. (2019). Accelerated Load Testing of Geosynthetic Base Reinforced/Stabilized Unpaved and Pavement Test Sections [Tech Summary] (Report No. State Project No. 736-99-1735 / LTRC Project No. 11-3GT). Louisiana Transportation Research Center. https://rosap.ntl.bts.gov/view/dot/66186
Abu-Farsakh, Murad Y. and Zhongjie Zhang. Accelerated Load Testing of Geosynthetic Base Reinforced/Stabilized Unpaved and Pavement Test Sections [Tech Summary]. Report no. State Project No. 736-99-1735 / LTRC Project No. 11-3GT. Louisiana Transportation Research Center, 2019. https://rosap.ntl.bts.gov/view/dot/66186.
Abu-Farsakh, Murad Y., and Zhongjie Zhang Accelerated Load Testing of Geosynthetic Base Reinforced/Stabilized Unpaved and Pavement Test Sections [Tech Summary]. Louisiana Transportation Research Center, 2019, Report no. State Project No. 736-99-1735 / LTRC Project No. 11-3GT, ROSA P. https://rosap.ntl.bts.gov/view/dot/66186.
ROSA P serves as an archival repository of USDOT-published products including scientific
findings, journal articles, guidelines, recommendations, or other information authored or co-authored by
USDOT or funded partners. As a repository, ROSA P retains documents in their original published format to
ensure public access to scientific information.
Links with this icon indicate that you are leaving a Bureau of Transportation
Statistics (BTS)/National Transportation Library (NTL)
Web-based service.
Thank you for visiting.
You are about to access a non-government link outside of
the U.S. Department of Transportation's National
Transportation Library.
Please note: While links to Web sites outside of DOT are
offered for your convenience, when you exit DOT Web sites,
Federal privacy policy and Section 508 of the Rehabilitation
Act (accessibility requirements) no longer apply. In
addition, DOT does not attest to the accuracy, relevance,
timeliness or completeness of information provided by linked
sites. Linking to a Web site does not constitute an
endorsement by DOT of the sponsors of the site or the
products presented on the site. For more information, please
view DOT's Web site linking policy.
To get back to the page you were previously viewing, click
your Cancel button.