Synthesis for Best Practices for Preventive Maintenance Preparatory Work [Summary]
-
2022-08-31
Details:
-
Creators:
-
Corporate Creators:
-
Corporate Contributors:
-
Subject/TRT Terms:
-
Resource Type:
-
Geographical Coverage:
-
Edition:Summary
-
Contracting Officer:
-
Corporate Publisher:
-
Abstract:The synthesis study focused on pavement preparatory work performed before preventive maintenance (PM) surfacing contracts with the goal of answering, “What work needs to be performed to the roadway before a new surface is placed?” Preparatory work performed by in-house maintenance forces or maintenance contracts may include crack sealing, fog seal, repairs, milling, and level-up and should be performed well in advance of the PM contract. Both flexible and rigid pavements may require work in advance of a PM contract. Seal coats or thin overlays are typical PM surfacing projects.
-