Tangirala, A., & Kerns, J. (2021). Assessment of Existing and Potential Volume Reduction for Post Construction Stormwater Management (Report No. FHWA/OH-2022-10). Ohio. Department of Transportation. Office of Statewide Planning and Research. https://rosap.ntl.bts.gov/view/dot/64265
Tangirala, Anil and Justin Kerns. Assessment of Existing and Potential Volume Reduction for Post Construction Stormwater Management. Report no. FHWA/OH-2022-10. Ohio. Department of Transportation. Office of Statewide Planning and Research, 2021. https://rosap.ntl.bts.gov/view/dot/64265.
Tangirala, Anil, and Justin Kerns Assessment of Existing and Potential Volume Reduction for Post Construction Stormwater Management. Ohio. Department of Transportation. Office of Statewide Planning and Research, 2021, Report no. FHWA/OH-2022-10, ROSA P. https://rosap.ntl.bts.gov/view/dot/64265.
The Assessment of Existing and Potential Volume Reduction for Post Construction Stormwater Management research project focuses on developing additional options for post construction BMPs available to ODOT projects. Real-time flow monitoring equipment was installed along ODOT roadways to measure stormwater runoff across the state of Ohio. This resulted in the largest data collection effort of its kind in the state of Ohio. Through extensive performance evaluation and cost-benefit analysis, a new BMP, the Amended Vegetated Filter Strip (AVFS), has been developed for inclusion in ODOT’s Locations and Design Manual, which provides design guidance for all ODOT construction projects.
Tangirala, A., & Kerns, J. (2021). Assessment of Existing and Potential Volume Reduction for Post Construction Stormwater Management (Report No. FHWA/OH-2022-10). Ohio. Department of Transportation. Office of Statewide Planning and Research. https://rosap.ntl.bts.gov/view/dot/64265
Tangirala, Anil and Justin Kerns. Assessment of Existing and Potential Volume Reduction for Post Construction Stormwater Management. Report no. FHWA/OH-2022-10. Ohio. Department of Transportation. Office of Statewide Planning and Research, 2021. https://rosap.ntl.bts.gov/view/dot/64265.
Tangirala, Anil, and Justin Kerns Assessment of Existing and Potential Volume Reduction for Post Construction Stormwater Management. Ohio. Department of Transportation. Office of Statewide Planning and Research, 2021, Report no. FHWA/OH-2022-10, ROSA P. https://rosap.ntl.bts.gov/view/dot/64265.
ROSA P serves as an archival repository of USDOT-published products including scientific
findings, journal articles, guidelines, recommendations, or other information authored or co-authored by
USDOT or funded partners. As a repository, ROSA P retains documents in their original published format to
ensure public access to scientific information.
Links with this icon indicate that you are leaving a Bureau of Transportation
Statistics (BTS)/National Transportation Library (NTL)
Web-based service.
Thank you for visiting.
You are about to access a non-government link outside of
the U.S. Department of Transportation's National
Transportation Library.
Please note: While links to Web sites outside of DOT are
offered for your convenience, when you exit DOT Web sites,
Federal privacy policy and Section 508 of the Rehabilitation
Act (accessibility requirements) no longer apply. In
addition, DOT does not attest to the accuracy, relevance,
timeliness or completeness of information provided by linked
sites. Linking to a Web site does not constitute an
endorsement by DOT of the sponsors of the site or the
products presented on the site. For more information, please
view DOT's Web site linking policy.
To get back to the page you were previously viewing, click
your Cancel button.