Concrete Overlay: Alabama I-59: Concrete on Concrete–Unbonded [case study]
-
2021-08-01
Details:
-
Creators:
-
Corporate Creators:
-
Contributors:
-
Subject/TRT Terms:
-
Publication/ Report Number:
-
Resource Type:
-
Geographical Coverage:
-
Contracting Officer:
-
Corporate Publisher:
-
Abstract:Concrete on concrete–unbonded (COC–U) overlays leverage the investment already made in the existing pavement structure while eliminating the need for extensive preservation activities. This case study summarizes the design, construction, and performance of a COC–U overlay of an existing jointed concrete pavement.
-
Format:
-
Collection(s):
-
Main Document Checksum:
-
Download URL:
-
File Type: