Marquis, B. (2005). Using Foamed Asphalt as a Stabilizing Agent in Full Depth Reclamation of Route 8 in Belgrade: Interim Report – Second Year, January 2005 (Report No. Technical Report 02-2). Maine. Department of Transportation. https://rosap.ntl.bts.gov/view/dot/60983
Marquis, Brian. Using Foamed Asphalt as a Stabilizing Agent in Full Depth Reclamation of Route 8 in Belgrade: Interim Report – Second Year, January 2005. Report no. Technical Report 02-2. Maine. Department of Transportation, 2005. https://rosap.ntl.bts.gov/view/dot/60983.
Marquis, Brian Using Foamed Asphalt as a Stabilizing Agent in Full Depth Reclamation of Route 8 in Belgrade: Interim Report – Second Year, January 2005. Maine. Department of Transportation, 2005, Report no. Technical Report 02-2, ROSA P. https://rosap.ntl.bts.gov/view/dot/60983.
Federal project number STP-9197(00)X on State Route 8 between the towns of Belgrade and Smithfield was selected for Foamed Asphalt stabilization. This is a Highway Improvement project beginning at the intersection of State Route 11 in Belgrade and extending northerly 10.15 km (6.31 mi). This project has a high occurrence of frost deformation with rut depths of 18 mm (0.7 in) in areas and International Roughness Index values as high as 3.17 m/km (201 in/mi). Sections of the project were built to state standards and are scheduled for resurfacing only. Other sections are scheduled for either Full Depth Reconstruction, Full Depth Reclamation with Variable Depth Gravel or Full Depth Reclamation with Foamed Asphalt.
Marquis, B. (2005). Using Foamed Asphalt as a Stabilizing Agent in Full Depth Reclamation of Route 8 in Belgrade: Interim Report – Second Year, January 2005 (Report No. Technical Report 02-2). Maine. Department of Transportation. https://rosap.ntl.bts.gov/view/dot/60983
Marquis, Brian. Using Foamed Asphalt as a Stabilizing Agent in Full Depth Reclamation of Route 8 in Belgrade: Interim Report – Second Year, January 2005. Report no. Technical Report 02-2. Maine. Department of Transportation, 2005. https://rosap.ntl.bts.gov/view/dot/60983.
Marquis, Brian Using Foamed Asphalt as a Stabilizing Agent in Full Depth Reclamation of Route 8 in Belgrade: Interim Report – Second Year, January 2005. Maine. Department of Transportation, 2005, Report no. Technical Report 02-2, ROSA P. https://rosap.ntl.bts.gov/view/dot/60983.
ROSA P serves as an archival repository of USDOT-published products including scientific
findings, journal articles, guidelines, recommendations, or other information authored or co-authored by
USDOT or funded partners. As a repository, ROSA P retains documents in their original published format to
ensure public access to scientific information.
Links with this icon indicate that you are leaving a Bureau of Transportation
Statistics (BTS)/National Transportation Library (NTL)
Web-based service.
Thank you for visiting.
You are about to access a non-government link outside of
the U.S. Department of Transportation's National
Transportation Library.
Please note: While links to Web sites outside of DOT are
offered for your convenience, when you exit DOT Web sites,
Federal privacy policy and Section 508 of the Rehabilitation
Act (accessibility requirements) no longer apply. In
addition, DOT does not attest to the accuracy, relevance,
timeliness or completeness of information provided by linked
sites. Linking to a Web site does not constitute an
endorsement by DOT of the sponsors of the site or the
products presented on the site. For more information, please
view DOT's Web site linking policy.
To get back to the page you were previously viewing, click
your Cancel button.