Using Foamed Asphalt as a Stabilizing Agent in Full Depth Reclamation of Route 8 in Belgrade: Interim Report – Third and Fourth Year, October 2006
Advanced Search
Select up to three search categories and corresponding keywords using the fields to the right. Refer to the Help section for more detailed instructions.

Search our Collections & Repository

For very narrow results

When looking for a specific result

Best used for discovery & interchangable words

Recommended to be used in conjunction with other fields

Dates

to

Document Data
Library
People
Clear All
Clear All

For additional assistance using the Custom Query please check out our Help Page

i

Using Foamed Asphalt as a Stabilizing Agent in Full Depth Reclamation of Route 8 in Belgrade: Interim Report – Third and Fourth Year, October 2006

Filetype[PDF-215.41 KB]


English

Details:

  • Creators:
  • Corporate Creators:
  • Subject/TRT Terms:
  • Publication/ Report Number:
  • Resource Type:
  • Geographical Coverage:
  • Corporate Publisher:
  • Abstract:
    Maine has a variety of soil types throughout the state. A majority of these soil types degrade rapidly and have poor stability. To eliminate the cost of supplying quality road base material from a distant source and increase the stability of existing soils, the Maine Department of Transportation (MaineDOT) has been requiring contractors to rehabilitate roads using the full depth reclamation process. Full depth reclamation involves milling the existing bituminous pavement plus a portion of the base material. The milled material is then graded and compacted. Traffic can use the roadway until a bituminous base and wearing surface is applied. In addition to using full depth reclaimed material, MaineDOT has been experimenting with adding a number of stabilizing agents to virgin or recycled base materials to increase stability. Stabilizing agents utilized include cement, emulsion and calcium chloride. Foamed Asphalt is another stabilizing agent. This is a mixture of air, water and hot asphalt. Cold water is introduced to hot asphalt causing the asphalt to foam and expand by more than 10 times its original volume. During this foaming action the asphalt has a reduced viscosity making it much easier to mix with aggregates. A specialized piece of equipment mills the existing bituminous pavement and base material and introduces Foamed Asphalt all in one process. The material is then shaped to grade and compacted. Traffic can operate on the stabilized base until a hot mix asphalt base and wearing surface is applied. This paper will evaluate the performance of Foamed Asphalt over a five year period.
  • Format:
  • Collection(s):
  • Main Document Checksum:
  • Download URL:
  • File Type:

Supporting Files

  • No Additional Files
More +

You May Also Like

Checkout today's featured content at rosap.ntl.bts.gov