This report describes a project in which approximately 6,200 tons (5,630 Mg) of asphaltic concrete were recycled through a conventional asphalt batch plant. During the construction of the project, a buildup of asphalt-coated fines occurred in the dryer and the dust collector. The buildup is thought to have been associated with the fineness and/or the high asphalt content of the recycled mix. To solve the problem, a change was made in the recycling process. The project was completed using a heat transfer method with mix proportions as high as 50% recycled material added to 50% virgin aggregate.
After some success in the process of recycling asphalt pavements in 1975, Kossuth County decided to implement further recycling projects on a larger s...
The primary objective of this project was to demonstrate the feasibility of constructing a bituminous pavement by the hot recycling process. Secondary...
Links with this icon indicate that you are leaving a Bureau of Transportation
Statistics (BTS)/National Transportation Library (NTL)
Web-based service.
Thank you for visiting.
You are about to access a non-government link outside of
the U.S. Department of Transportation's National
Transportation Library.
Please note: While links to Web sites outside of DOT are
offered for your convenience, when you exit DOT Web sites,
Federal privacy policy and Section 508 of the Rehabilitation
Act (accessibility requirements) no longer apply. In
addition, DOT does not attest to the accuracy, relevance,
timeliness or completeness of information provided by linked
sites. Linking to a Web site does not constitute an
endorsement by DOT of the sponsors of the site or the
products presented on the site. For more information, please
view DOT's Web site linking policy.
To get back to the page you were previously viewing, click
your Cancel button.