Hadi, M., Orabi, W., Xiao, Y., Ibrahim, M., & Jia, J. (2017). Estimating Total Cost of Bridge Construction Using ABC and Conventional Methods of Construction. Florida International University. Department of Civil and Environmental Engineering. https://rosap.ntl.bts.gov/view/dot/42743
Hadi, Mohammed, Wallied Orabi, Yan Xiao, Mohamed Ibrahim, and Jianmin Jia. Estimating Total Cost of Bridge Construction Using ABC and Conventional Methods of Construction. Florida International University. Department of Civil and Environmental Engineering, 2017. https://rosap.ntl.bts.gov/view/dot/42743.
Hadi, Mohammed, et al. Estimating Total Cost of Bridge Construction Using ABC and Conventional Methods of Construction. Florida International University. Department of Civil and Environmental Engineering, 2017, ROSA P. https://rosap.ntl.bts.gov/view/dot/42743.
One of the most important factors that the decision-makers consider when deciding on whether using ABC or not is the total construction cost of the project using these methods versus the conventional methods. The total construction cost includes both direct costs such as the material, labor, and equipment costs needed during construction and indirect costs associated with preliminary engineering, right-of-way, construction engineering, and inspection. However, there is a lack of tools that can help decision-makers in accurately estimating the construction cost of the ABC projects which, in some cases, might yield to an unsuitable decision. Therefore, this type of cost needs to be analyzed and estimated to support better decisions in selecting ABC versus conventional bridge construction methods.
Hadi, M., Orabi, W., Xiao, Y., Ibrahim, M., & Jia, J. (2017). Estimating Total Cost of Bridge Construction Using ABC and Conventional Methods of Construction. Florida International University. Department of Civil and Environmental Engineering. https://rosap.ntl.bts.gov/view/dot/42743
Hadi, Mohammed, Wallied Orabi, Yan Xiao, Mohamed Ibrahim, and Jianmin Jia. Estimating Total Cost of Bridge Construction Using ABC and Conventional Methods of Construction. Florida International University. Department of Civil and Environmental Engineering, 2017. https://rosap.ntl.bts.gov/view/dot/42743.
Hadi, Mohammed, et al. Estimating Total Cost of Bridge Construction Using ABC and Conventional Methods of Construction. Florida International University. Department of Civil and Environmental Engineering, 2017, ROSA P. https://rosap.ntl.bts.gov/view/dot/42743.
ROSA P serves as an archival repository of USDOT-published products including scientific
findings, journal articles, guidelines, recommendations, or other information authored or co-authored by
USDOT or funded partners. As a repository, ROSA P retains documents in their original published format to
ensure public access to scientific information.
Links with this icon indicate that you are leaving a Bureau of Transportation
Statistics (BTS)/National Transportation Library (NTL)
Web-based service.
Thank you for visiting.
You are about to access a non-government link outside of
the U.S. Department of Transportation's National
Transportation Library.
Please note: While links to Web sites outside of DOT are
offered for your convenience, when you exit DOT Web sites,
Federal privacy policy and Section 508 of the Rehabilitation
Act (accessibility requirements) no longer apply. In
addition, DOT does not attest to the accuracy, relevance,
timeliness or completeness of information provided by linked
sites. Linking to a Web site does not constitute an
endorsement by DOT of the sponsors of the site or the
products presented on the site. For more information, please
view DOT's Web site linking policy.
To get back to the page you were previously viewing, click
your Cancel button.