Laval, J. A., Guin, A., Chilukuri, B. R., & Cho, H. W. (2019). Implementation of Optimal Parameter Settings in GDOT’s Current Ramp Metering Operation (Report No. FHWA-GA-19-1418). Georgia. Department of Transportation. https://rosap.ntl.bts.gov/view/dot/40263
Laval, Jorge A., Angshuman Guin, Bhargava Rama Chilukuri, and Hyun W. Cho. Implementation of Optimal Parameter Settings in GDOT’s Current Ramp Metering Operation. Report no. FHWA-GA-19-1418. Georgia. Department of Transportation, 2019. https://rosap.ntl.bts.gov/view/dot/40263.
Laval, Jorge A., et al. Implementation of Optimal Parameter Settings in GDOT’s Current Ramp Metering Operation. Georgia. Department of Transportation, 2019, Report no. FHWA-GA-19-1418, ROSA P. https://rosap.ntl.bts.gov/view/dot/40263.
The objective of this study is to optimize the parameter settings for the local ramp metering control system currently in operation in the Metro Atlanta freeway network. The study corridor is Eastbound/Southbound I-285 between GA 400 and I-20. Using a stochastic simulation-based optimization framework that combines microsimulation model GTsim and a genetic algorithm-based optimization module, we determine the optimal parameter values of the ramp-metering control system. We generate optimal ramp metering values for 11 ramp-metering locations. The results of this project are expected to improve ramp metering efficiency and mitigate freeway congestion.
Laval, J. A., Guin, A., Chilukuri, B. R., & Cho, H. W. (2019). Implementation of Optimal Parameter Settings in GDOT’s Current Ramp Metering Operation (Report No. FHWA-GA-19-1418). Georgia. Department of Transportation. https://rosap.ntl.bts.gov/view/dot/40263
Laval, Jorge A., Angshuman Guin, Bhargava Rama Chilukuri, and Hyun W. Cho. Implementation of Optimal Parameter Settings in GDOT’s Current Ramp Metering Operation. Report no. FHWA-GA-19-1418. Georgia. Department of Transportation, 2019. https://rosap.ntl.bts.gov/view/dot/40263.
Laval, Jorge A., et al. Implementation of Optimal Parameter Settings in GDOT’s Current Ramp Metering Operation. Georgia. Department of Transportation, 2019, Report no. FHWA-GA-19-1418, ROSA P. https://rosap.ntl.bts.gov/view/dot/40263.
ROSA P serves as an archival repository of USDOT-published products including scientific
findings, journal articles, guidelines, recommendations, or other information authored or co-authored by
USDOT or funded partners. As a repository, ROSA P retains documents in their original published format to
ensure public access to scientific information.
Links with this icon indicate that you are leaving a Bureau of Transportation
Statistics (BTS)/National Transportation Library (NTL)
Web-based service.
Thank you for visiting.
You are about to access a non-government link outside of
the U.S. Department of Transportation's National
Transportation Library.
Please note: While links to Web sites outside of DOT are
offered for your convenience, when you exit DOT Web sites,
Federal privacy policy and Section 508 of the Rehabilitation
Act (accessibility requirements) no longer apply. In
addition, DOT does not attest to the accuracy, relevance,
timeliness or completeness of information provided by linked
sites. Linking to a Web site does not constitute an
endorsement by DOT of the sponsors of the site or the
products presented on the site. For more information, please
view DOT's Web site linking policy.
To get back to the page you were previously viewing, click
your Cancel button.