Analysis of Past NBI Ratings to Determine Future Bridge Preservation Needs: Technical Summary
-
2004-01-01
Details:
-
Creators:
-
Corporate Creators:
-
Corporate Contributors:
-
Subject/TRT Terms:
-
Publication/ Report Number:
-
Resource Type:
-
Geographical Coverage:
-
Corporate Publisher:
-
Abstract:The goal of this project was to develop a practical procedure for the LADOTD bridge management system. Specifically, the research team used the current and past NBI data to develop a three-element database for the PONTIS program and calibrate the generalized Louisiana bridge element deterioration models.
-
Format:
-
Collection(s):
-
Main Document Checksum:
-
Download URL:
-
File Type: