ORANGES Evaluation Test Plans: Test Plans for the US DOT Sponsored Evaluation of the ORANGES Electronic Payment Systems Field Operational Test
-
2002-09-04
Details:
-
Corporate Creators:
-
Corporate Contributors:
-
Subject/TRT Terms:
-
Resource Type:
-
Geographical Coverage:
-
Edition:Revision 2
-
Corporate Publisher:
-
Abstract:This document is one of a series of working papers that report on progress for the US DOT evaluation for Phase I of the ORANGES field operational test. Each working paper corresponds to a Phase I task. At the conclusion of Phase I, these documents will be updated and compiled to form a final report. Phase I documents include: · Evaluation Strategy and Plan – issued November 6, 2001 · Test Plans – this document The test plans reflect the current design and plans for ORANGES implementation, as of the date of this document. The design could still vary prior to or during implementation. The evaluation goals and measures have changed from those originally presented in the Evaluation Strategy and Plan document. The FOT partners believe the limited scale of anticipated deployment could limit noticeable changes in the evaluation measures. The evaluation team has addressed this issue in developing test plans (e.g., by focusing data collection on the specific equipment and riders to be involved in the limited scale deployment). This is nonetheless acknowledged as a legitimate issue for the context to interpreting the data analysis.
-
Format:
-
Collection(s):
-
Main Document Checksum:
-
Download URL:
-
File Type: