Carter, M., Chandra, A., Luttrell, T., & Sallman, D. (2003). Silicon Valley Smart Corridor: Final Evaluation Report (Report No. FHWA-OP-04-025). United States. Department of Transportation. https://rosap.ntl.bts.gov/view/dot/3887
Carter, M., A. Chandra, Timothy Luttrell, and Doug Sallman. Silicon Valley Smart Corridor: Final Evaluation Report. Report no. FHWA-OP-04-025. United States. Department of Transportation, 2003. https://rosap.ntl.bts.gov/view/dot/3887.
Carter, M., et al. Silicon Valley Smart Corridor: Final Evaluation Report. United States. Department of Transportation, 2003, Report no. FHWA-OP-04-025, ROSA P. https://rosap.ntl.bts.gov/view/dot/3887.
This document summarizes the findings from the evaluation of the integrated freeway, arterial, and incident management system known as the Silicon Valley Smart Corridor (SVSC). Centered along the Highway 17/Interstate 880 corridor in San Jose, California, the SVSC was one of approximately 65 deployments occurring nationally under the direction and partial funding of the FY 1999 National ITS Integration Earmark Program, and one of eight sites selected for targeted, independent national evaluation. The SVSC system was designed to demonstrate measurable safety and mobility benefits in a critical commuter corridor in the Silicon Valley Region. Unfortunately, the implementation was plagued by a series of delays, including continual cuts to the system’s fiber network. In addition, baseline data collection and analysis revealed that even when the system did become operational, it was unlikely to deliver significant benefits within a reasonable period of time. A crumbling regional economy and inadequate project planning both contributed to this situation. This document summarizes the results of the evaluation of the SVSC and presents the status of the deployment as of December 31, 2002.
Carter, M., Chandra, A., Luttrell, T., & Sallman, D. (2003). Silicon Valley Smart Corridor: Final Evaluation Report (Report No. FHWA-OP-04-025). United States. Department of Transportation. https://rosap.ntl.bts.gov/view/dot/3887
Carter, M., A. Chandra, Timothy Luttrell, and Doug Sallman. Silicon Valley Smart Corridor: Final Evaluation Report. Report no. FHWA-OP-04-025. United States. Department of Transportation, 2003. https://rosap.ntl.bts.gov/view/dot/3887.
Carter, M., et al. Silicon Valley Smart Corridor: Final Evaluation Report. United States. Department of Transportation, 2003, Report no. FHWA-OP-04-025, ROSA P. https://rosap.ntl.bts.gov/view/dot/3887.
ROSA P serves as an archival repository of USDOT-published products including scientific
findings, journal articles, guidelines, recommendations, or other information authored or co-authored by
USDOT or funded partners. As a repository, ROSA P retains documents in their original published format to
ensure public access to scientific information.
Links with this icon indicate that you are leaving a Bureau of Transportation
Statistics (BTS)/National Transportation Library (NTL)
Web-based service.
Thank you for visiting.
You are about to access a non-government link outside of
the U.S. Department of Transportation's National
Transportation Library.
Please note: While links to Web sites outside of DOT are
offered for your convenience, when you exit DOT Web sites,
Federal privacy policy and Section 508 of the Rehabilitation
Act (accessibility requirements) no longer apply. In
addition, DOT does not attest to the accuracy, relevance,
timeliness or completeness of information provided by linked
sites. Linking to a Web site does not constitute an
endorsement by DOT of the sponsors of the site or the
products presented on the site. For more information, please
view DOT's Web site linking policy.
To get back to the page you were previously viewing, click
your Cancel button.