Adams, M., & Nicks, J. (2018). Design and Construction Guidelines for Geosynthetic Reinforced Soil Abutments and Integrated Bridge Systems (Report No. FHWA-HRT-17-080;HRDI-40/06-18(200)E). United States. Federal Highway Administration. https://rosap.ntl.bts.gov/view/dot/37547
Adams, Michael and Jennifer Nicks. Design and Construction Guidelines for Geosynthetic Reinforced Soil Abutments and Integrated Bridge Systems. Report no. FHWA-HRT-17-080;HRDI-40/06-18(200)E. United States. Federal Highway Administration, 2018. https://rosap.ntl.bts.gov/view/dot/37547.
Adams, Michael, and Jennifer Nicks Design and Construction Guidelines for Geosynthetic Reinforced Soil Abutments and Integrated Bridge Systems. United States. Federal Highway Administration, 2018, Report no. FHWA-HRT-17-080;HRDI-40/06-18(200)E, ROSA P. https://rosap.ntl.bts.gov/view/dot/37547.
This manual outlines the state of the art and recommended practice for designing and constructing geosynthetic reinforced soil (GRS) technology for the application of abutments and the Integrated Bridge System (IBS). It was developed to provide engineers with the necessary background knowledge of GRS technology and its fundamental characteristics as an alternative to other construction methods. This manual presents step-by-step guidance on the design of GRS-IBS using the Load and Resistance Factor Design methodology. Material specifications for standard GRS-IBS are also provided. Detailed construction guidance is presented along with methods for the inspection, performance monitoring, maintenance, and repair of GRS-IBS. Quality assurance and quality control procedures are also covered. The procedures presented are based on 40 years of State and Federal research and deployment efforts focused on GRS technology for bridge support.
Content Notes:
This manual supersedes the "Geosynthetic Reinforced Soil Integrated Bridge System Interim Implementation Guide."
Adams, M., & Nicks, J. (2018). Design and Construction Guidelines for Geosynthetic Reinforced Soil Abutments and Integrated Bridge Systems (Report No. FHWA-HRT-17-080;HRDI-40/06-18(200)E). United States. Federal Highway Administration. https://rosap.ntl.bts.gov/view/dot/37547
Adams, Michael and Jennifer Nicks. Design and Construction Guidelines for Geosynthetic Reinforced Soil Abutments and Integrated Bridge Systems. Report no. FHWA-HRT-17-080;HRDI-40/06-18(200)E. United States. Federal Highway Administration, 2018. https://rosap.ntl.bts.gov/view/dot/37547.
Adams, Michael, and Jennifer Nicks Design and Construction Guidelines for Geosynthetic Reinforced Soil Abutments and Integrated Bridge Systems. United States. Federal Highway Administration, 2018, Report no. FHWA-HRT-17-080;HRDI-40/06-18(200)E, ROSA P. https://rosap.ntl.bts.gov/view/dot/37547.
ROSA P serves as an archival repository of USDOT-published products including scientific
findings, journal articles, guidelines, recommendations, or other information authored or co-authored by
USDOT or funded partners. As a repository, ROSA P retains documents in their original published format to
ensure public access to scientific information.
Links with this icon indicate that you are leaving a Bureau of Transportation
Statistics (BTS)/National Transportation Library (NTL)
Web-based service.
Thank you for visiting.
You are about to access a non-government link outside of
the U.S. Department of Transportation's National
Transportation Library.
Please note: While links to Web sites outside of DOT are
offered for your convenience, when you exit DOT Web sites,
Federal privacy policy and Section 508 of the Rehabilitation
Act (accessibility requirements) no longer apply. In
addition, DOT does not attest to the accuracy, relevance,
timeliness or completeness of information provided by linked
sites. Linking to a Web site does not constitute an
endorsement by DOT of the sponsors of the site or the
products presented on the site. For more information, please
view DOT's Web site linking policy.
To get back to the page you were previously viewing, click
your Cancel button.